Startup
Startup
Startup
To prevent serious injury, only operate Reactor with
all covers and shrouds in place.
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage luctuations that can damage
electrical equipment and void the warranty.
1. Check
Check
Check luid
luid
luid inlet
inlet
inlet ilter
ilter
ilter screens.
screens.
screens.
Before daily startup, ensure that the
luid inlet screens are clean. See
Fluid Inlet Strainer Screens, page 57
2. Check
Check
Check ISO
ISO
ISO lubrication
lubrication
lubrication reservoir.
reservoir.
reservoir.
Check level and condition of ISO lube daily. See
Pump Lubrication System, page 59
3. Use A and B Drum Level Sticks (24M174) to
measure the material level in each drum. If
needed, the level can be entered and tracked in
the ADM. See
Advanced Setup Screens, page 35
.
4. Check
Check
Check generator
generator
generator fuel
fuel
fuel level.
level.
level.
NOTICE
NOTICE
NOTICE
Running out of fuel will cause voltage
luctuations that can damage electrical
equipment and void the warranty. Do not run
out of fuel.
5. Conirm
Conirm
Conirm main
main
main power
power
power switch
switch
switch isis
is OFF
OFF
OFF before
before
before starting
starting
starting
generator.
generator.
generator.
6. Ensure the main breaker on the generator is in
the off position.
7. Start the generator. Allow it to reach full operating
temperature.
8. Turn
Turn
Turn main
main
main power
power
power switch
switch
switch ON.
ON.
ON.
The ADM will display the following screen until
communication and initialization is complete.
44
334945C