System Component Identification
Key:
Key:
Key:
A
Frame
B
Blast Control Switch
B2
Blast Nozzle
C
Blast Hose
E
Pot
F
Bung Pin
G
Water Tank
H
Water Tank Lid
J
Pot Dump Valve
K
Auto Vent Valve
L
Blast Check Valve
M
Abrasive Ball Valve
N
Inlet Ball Valve
P
Control Box
Q
Emergency Stop
R
Blast Air Regulator
Key:
Key:
Key:
S
Abrasive Meter
T
Pot Pressure Regulator
U
Pot Pressure Gauge
V
Blast Air Pressure Gauge
W
Selector Valve
X
Rinse Ball Valve
Y
Air Supply Connection
Z
Blast Connection
ZA
Pneumatic Control Connection
ZB
Electric Control Connection
ZC
Supply Air Pressure Gauge
ZD
DataTrak (see
ZE
Accessory Extension hose
ZF
Abrasive Material
ZG
Fill Port Check Valve
DataTrak
DataTrak
DataTrak Controls
Controls
Controls
8
8
0
0
0
0
0
8
3
0
0
0
9
Key:
Key:
Key:
RK
Reset Key — Results in faults. Press and
hold for three seconds to clear the batch
totalizer.
CR
Cycle/Rate
BT
Batch Totalizer
GT
Grand Totalizer
334143C
7
Summary of Contents for EcoQuip 300
Page 5: ...Notes Notes Notes Notes 334143C 5...
Page 34: ...Parts Parts Parts Parts EQ300 EQ300 EQ300 and and and EQ600 EQ600 EQ600 34 334143C...
Page 36: ...Parts Enclosure Enclosure Enclosure 12 Torque fitting to 35 40 ft lb 47 54 N m 36 334143C...