background image

 

2

3A0528E

Instructions

1. Disconnect power source to G3 pump.

2. Drill hole in panel or plate. (See 

illustration of the right for cutout 
dimension. Maximim panel thick-
ness is 0.472 in./12.0 mm).

3. Remove lock nut (a) from button (1).

Install o-ring (5) (F

IG

. 1).

4. For illuminated remote manual output 

installations, connect end of wiring har-
ness (4) to connector location on G3 
pump identified with symbol to the right. 
(See wiring diagram, page 4.)

NOTE:

 For 5-wire power cable installations (Graco 

Part No. 123750, sold separately), connect end of 
wiring harness to CPC power input. (See wiring dia-
gram, page 4.)

5. Route and secure wire harness (4) from G3 installa-

tion location. Trim excess wire length from wiring 
harness (4).

6. Strip approximately 1” of harness jacket and 1/4” of 

conductor back. Install quick connectors (2) to wires 
(4) using a crimp connector.

7. Insert end of wires (4) from the back side of panel or 

plate, through lock nut (a) and through hole in panel 
or plate (c) (F

IG

. 2). (Note location of o-ring (5) for 

correct installation.)

8. Connect wiring harness (4) to button (1) . Refer to 

wiring diagram page 4.

9. Insert button through hole in panel or plate (b) and 

hand tighten lock nut (a) to secure button (1) in 
place.

10. Clean surface around outer edge of button (1). Posi-

tion label (3) around button and adhere label to 
panel or plate.

Testing Installation

Illuminated Remote Manual Run

1. Power up G3 and enter 

Setup Mode by pressing 
both the UP and DOWN 
ARROW buttons together 
for 3 seconds. 

2. Button illumination should cycle between green, yel-

low and red.

3. Press Reset button to exit test.

F

IG

. 1

0.748” [19.0 mm]

1

5

a

F

IG

. 2

F

IG

. 3

a

4

c

5

3

1

Reviews: