Shutdown and Care of the Pump
42
333586E
2. Set the Ram Air Regulator (BB) to 0 psi.
3. Set the Ram Director Valve (BC) to UP.
4. Slowly increase the pressure on the Ram Air
Regulator until the Platen (AD) starts to raise, and
immediately press and hold the Blowoff Button (BE)
until the Platen is completely out of the drum.
5. Release the Blowoff Button (BE) and allow the Ram
to rise to its full height.
6. Remove the empty drum.
F
IG
. 37. Power Disconnect
AK
AZ
Heated System
AZ
Ambient System
Excessive air pressure in the material drum could
cause the drum to rupture, causing serious injury. The
Platen must be free to move out of the drum. Never
use drum blowoff air with a damaged drum.
F
IG
. 38. Integrated Air Controls
BB
BC
BE
Summary of Contents for 333586E
Page 96: ...Wiring Diagrams 96 333586E Wiring Diagrams...
Page 97: ...Wiring Diagrams 333586E 97...
Page 98: ...Wiring Diagrams 98 333586E...
Page 99: ...Wiring Diagrams 333586E 99...