Operation
3A9002A
15
8. Increase pressure 1/2 turn to start
motor. Allow paint or other material to
circulate through FieldLazer until mate
-
rial flows out the drain tube.
9. When FieldLazer starts pumping, flush
-
ing fluid and air bubbles will be purged
from system. Allow fluid to flow out of
drain tube into waste pail for 30 to 60
seconds.
10. Turn ON/OFF switch to
OFF
position.
Power button is not illuminated when
OFF.
11. Inspect for leaks. If leaks occur, per
form
page 12, then tighten all fittings. If there
are no leaks continue with the next
step.
Fill Pump
1. Move suction tube to paint pail and
submerge suction tube in paint.
2. Press ON/OFF switch to
ON
position.
Button is illuminated when power is
ON.
3. Wait to see paint coming out of the
drain tube.
4. Press ON/OFF switch to
OFF
position.
Button is illuminated when power is
OFF.
NOTE:
Some fluids may prime faster if
the ON/OFF switch is momentarily
turned off so the pump can slow and
stop. Turn ON/OFF switch on and off
several times if necessary.
High-pressure spray is able to inject
toxins into the body and cause serious
bodily injury. Do not stop leaks with hand
or rag.