Setup and Operation
3A5083C
9
Setup and Operation
Before Installing
Place box on the ground before installing battery. Do not
move box with a battery installed.
Attach Metal Box to Pole
(Optional)
1.
Set the control box (B) on the base of the stand unit.
2.
Using two U-bolts (B1), and their corresponding
mounting plates (B2) and nuts (B3), loosely attach
the control box (B) to the pole (S). See F
IG
. 3.
NOTE:
It is recommended that the control box (B) be
mounted facing the opposite direction as the solar panel
(C), and that the control box (B) be mounted before the
battery is placed inside.
3.
Slide the control box (B) up the to the desired height
and tighten the nuts (B3) so that the control box is
securely attached to the stand unit (S).
Solar Panel Installation
Refer to Stand Kits manual for panel installation. (See
on page 2.)
Connect the solar panel cable to the MC4 connectors
extending from the grommet at the back of the control
box, ensuring the positive and negative leads are con-
nected as labeled. See F
Incorrect wiring to the charge controller or battery
may result in an electrical or fire risk, and can damage
the equipment.
LIFTING HAZARD
The battery is heavy. To avoid injury or possible dam-
age to equipment, remove battery before handling the
control box.
F
IG
. 3 Control Box Attachment
B
B1
B2
B3
S
Incorrect wiring to the charge controller or battery
may result in an electrical or fire risk, and can damage
the equipment.
•
Do not reverse positive (+) and negative (-) battery
or array connections on the charge controller.
•
Do not reverse positive (+) and negative (-) con-
nections on the battery.
•
Do not use a jumper across array negative (-) and
battery negative (-) terminals.