Setup
8
3A5202G
Prepare Unit for Operation
1. Verify that the front leg hitch clip (BA) is installed
and the hopper is secured to both sides of the frame
with hopper ring pins (G).
2. Verify that the motor toggle latch (BB), located on
the rear cart leg, is engaged with the motor mount
and secured with a rear toggle-latch clip (BBA) and
frame safety pin (BA).
3. Verify that the motor (C) is securely mounted. The
motor alignment pin (CA) must be installed and
secured with a motor alignment pin washer (CAB)
and motor alignment pin clip (CAA).
4. Verify that switch (EA) is in the off position, then
connect the motor power cable (CB).
5. Verify that both mix tube toggle latches (FAA) on
mixing tube (FA) are latched with their locking tabs
engaged.
During setup, the cart could collapse and crush
fingers and other body parts. To avoid possible injury,
make sure all clips and pins are in place, ensure the
mixer is on level ground, and always complete steps
1 and 2 before beginning setup or moving equipment.
WLD
*
%$
WLD
%%
%%$
&
WLD
&$
&$$
&
&
&$%
&%
WLD
WLD
)$$
)$
)$$