background image

3A1307A

3

8.

Connect blue and yellow cables (21) from the winch 
terminals to blue and yellow color-coded terminals 
on winch switch terminal. 

9.

Disconnect ground terminal on battery. Connect red 
and black cables (21) to red and black color-coded 
winch switch terminals. Attach the red cable from 
the winch control connector and power cable from 
the winch switch to the positive terminal on the bat-
tery. Then connect the black cable to the ground ter-
minal on the battery. See 

Wiring Diagram, 

page

 

4.

10. Connect the green plugs from the winch control con-

nector and the winch switch as showed in 

Wiring 

Diagram, 

page

 

4.

11. Plug in winch controller (19) to the connector and 

route to the cab of the vehicle. Properly protect and 
secure all wires to keep from damaging them during 
every day use. 

12. Adjust the winch arm (3) so it is in line with the lifting 

point on the gun arm. Ensure the winch arm is 
secured by pinning it and tightening the extension 
clamp (15).

13. Use the buttons on the controller to lower the winch. 

Connect the winch hook (22) to the lifting point on 
the gun arm. 

14. When transporting the RoadPak system, the gun 

arm must be properly stowed (see manual 3A1214) 
and the winch arm must be adjusted to fit within the 
width of the vehicle. 

ti17111a

21

ti17112a

ti17114a

22

Reviews: