Pressure Relief Procedure
310665E
15
Pump to Fluid Manifold
1.
Close shutoff valves G
A
and G
B
.
2.
Place waste container under sampling valves H
A
and H
B
.
3.
Turn function knob to pressure relief/park
.
4.
Press
. Indicator A comes on, and Pump A pres-
surizes.
TI4957b
H
B
G
B
H
A
G
A
5.
Open sampling valve A slowly to bleed off pressure.
Indicator A will stay on for 5 sec after Pump A
reaches Park position, then go off.
6.
Indicator B comes on and Pump B pressurizes.
7.
Open sampling valve B slowly to bleed off pressure.
Indicator B will stay on for 5 sec after Pump B
reaches Park position, then go off.
If both pumps are not parked after 1 min, Alarm
26 will sound.
8.
Close sampling valves A and B before restarting
system.
Pump air supply pressure must be sufficient to
cause pumps to stroke to bottom-most position
when function knob to is set to pressure relief/park
.
Summary of Contents for 234614
Page 18: ...Flushing 18 310665E...