Operation
10
3A3111 A
5. Prime catalyst BPO slave pump.
a. Make certain Dump Valve is closed.
b. Crack open the line fitting on the transducer
pressure manifold.
c. Operate slave pump until fluid leaks out of the
fitting loosened in Step b.
d. Tighten the line fitting on the transducer pres-
sure manifold.
6. Fill tanks with resin (J), catalyst (H), and solvent (G).
7. Start the unit, see Setup/Startup in Operation man-
ual (333388).
8. Verify tip and guard installation and check gun
placement. See Operation manual (333388) for
more information.
9. Open hydraulic valve (E) slowly to build
1200-1500psi on catalyst (BPO).
10. Close hydraulic valve (E).
NOTICE
Always rinse any spilled BPO/Benox off unit with
soapy water and then rinse with water to prevent oxi-
dation and decomposition.