Operation
3A8569A
7
Operation
Pressure Relief Procedure
Follow the Pressure Relief Procedure whenever
you see this symbol.
1.
Turn off and disconnect the power supply.
2.
Trigger the dispense valve into a grounded waste
container to relieve pressure.
Duty Cycle
The pump is designed to operate for a 50% duty cycle. It
can operate up to a maximum of 30 minutes of run time,
with an equal amount of down time.
Pump Start Up
1.
Check that the ball valve is in the off position.
2.
Turn the power switch, located on the terminal box,
to the ON position to start the pump.
NOTE: The pump has an internal bypass valve
(Pressure Relief Valve) that opens when the pump
discharge pressure exceeds 65 psi. If the flow is
blocked, the fluid will bypass within the pump.
3.
Insert the nozzle (15) into the container and open
the ball valve (16) to dispense fluid.
4.
Turn the switch to the OFF position immediately
after finishing dispensing.
5.
Close the ball valve (16).
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as splashing fluid and moving
parts, follow the Pressure Relief Procedure when you
stop dispensing and before cleaning, checking, or
servicing the equipment.
NOTICE
Never allow the pump to operate dry. Make sure that
the pump has fluid in it when the pump is initially
installed. Do not run the pump for more than five (5)
minutes with the pump discharge blocked. Do not
operate the pump continuously more than 30 minutes
in one (1) hour. Failure to follow these instructions can
result in damage to the pump.