Maintenance
313566J
17
Maintenance
Perform the following procedures once a shift.
NOTE:
If material is leaking, see
page 18.
Material Reservoirs
Check material levels and refill as necessary. Ensure
the material reservoirs are properly vented.
Air Dryer
Check the condition of the desiccant air dryer. Replace
as necessary.
Metering Rod Port (oil cup)
Lubricate with compatible lubricant such as mesamoll or
silicone oil.
Exterior
Check and clean the exterior of the valve.
Spool Valve Port (wet cups)
Fill with compatible lubricant such as mesamoll or sili-
cone oil.