background image

N0. 

Product Name 

Product ID 

Size 

6 Chamber full leg boot 

FL-35-0001 

35”  

6 Chamber full leg boot 

FL-30-0002 

30"  

6 Chamber full arm boot 

FA-27-0003 

34”x27”  

6 Chamber ankle boot  

AN-SD-0005 

22" x 17" 

6 Chamber large straight knee wrap  

ST-29-0006 

28.5” 18.5”   

6 Chamber straight knee wrap  

ST-19-0007 

19” 15”  

Page 1-1 

Summary of Contents for AN-SD-0005

Page 1: ...Sleeve Instruction Manual www gpe rd com service gpe rd com GPE Sequential Compression Sleeve ...

Page 2: ...Attachments 6 Chamber ankle sleeve 6 Chamber full arm sleeve 30 6 Chamber full leg sleeve 35 6 Chamber full leg sleeve 15 6 Chamber straight knee sleeve 19 6 Chamber straight knee sleeve Page 1 ...

Page 3: ...ot FL 35 0001 35 2 6 Chamber full leg boot FL 30 0002 30 3 6 Chamber full arm boot FA 27 0003 34 x27 4 6 Chamber ankle boot AN SD 0005 22 x 17 5 6 Chamber large straight knee wrap ST 29 0006 28 5 18 5 6 6 Chamber straight knee wrap ST 19 0007 19 15 Page 1 1 ...

Page 4: ... hold it For the arm sleeve wrap the Velcro strap under the armpit of the opposite arm and secure It may be necessary to unfasten the sleeves first by unzipping or pulling apart the Velcro before wearing 4 Before and after using the sleeves wipe the inside and outside with a 70 alcohol solution It may be necessary to unzip the sleeves to do this Afterwards dry with a dry cloth Sleeves are not mach...

Page 5: ...it Connect the male and female water line connectors Make sure the clamps are secure and the O ring is present on the male connector Attach the air line connectors and water line connectors to the desired sleeve s If using two sleeves then the splitter must be used Page 3 ...

Page 6: ...Wearing the ankle sleeve Step 2 Step 1 Step 3 Connect the water and air lines before wearing the sleeve Page 4 ...

Page 7: ...Step 1 Step 3 Step 2 Step 4 Wearing the universal sleeve Connect the water and air lines before wearing the sleeve Page 5 ...

Page 8: ...Step 1 Step 3 Step 2 Step 4 Wearing the straight knee sleeve Connect the water and air lines before wearing the sleeve Page 6 ...

Page 9: ...Step 1 Step 3 Step 2 Step 5 Wearing the arm sleeve can be worn on either side Step 4 Connect the water and air lines before wearing the sleeve Page 7 ...

Page 10: ...Wearing the full leg sleeve Step 2 Step 1 Step 3 Connect the water and air lines before wearing the sleeve Page 8 ...

Page 11: ...e labor charges incurred by GPE LLC in repairing or replacing the defective parts during the Warranty Period from the date of your purchase c GPE LLC also warrants that the repaired or replaced parts will be free from defects in material and workmanship for a period of FIFTEEN 15 days from the date of repair or replacement or for the remainder of the Warranty Period whichever is greater 5 GPE LLC ...

Page 12: ...Global Parts Enterprise LLC 1350 E Arapaho Rd Suite 116 Richardson TX 75081 https gpr rd com service gpe rd com 972 807 9516 www gpe rd com ...

Reviews: