GAS CLOSURE VENTILATION
OVEN SUPPORT STAND ENCLOSURE
It is important that the gas burner has sufficient ventilation to
operate correctly.
Gas ovens require clearance air spaces to ensure the gas
burner has adequate air intake. It is necessary to create an air
intake opening, measuring at least 500 mm x 500 mm, located
underneath the oven door/opening, as shown in the diagrams
above. Doing so will ensure that the air required for the gas
burner will be taken from the same atmospheric environment in
which the oven chamber opens. This is required for optimum
gas burner operation.
WARNING: Ensure the air intake opening remains clear from
obstruction at all times. When installing the oven outdoors, the
area around and beneath the oven must be kept clear of grass,
leaves and other combustible materials at ALL times.
Cladding to customers
design
Allow vent
In order for the gas burner to operate correctly, the external walls
of the oven support stand must be enclosed on all sides to shield
the gas burner from drafts or other atmospheric interruptions.
Support stand enclosure must be made entirely from non-
combustible materials.
Incorrect gas enclosure
Correct gas enclosure
PRE-INSTALL
VENTING
Summary of Contents for 100 x 75 Stone Core
Page 1: ...MASTER 100 X 75 VERSION 1 8 DATED 04 09 2020 INSTALLATION MANUAL EUROPE...
Page 2: ......
Page 5: ...CAUTIONS AND WARNINGS This section details the correct operation and install of a Gozney Oven...
Page 9: ......
Page 10: ......
Page 11: ...PRE INSTALL This section details how to correctly install a Gozney oven...
Page 20: ......
Page 21: ...0 0 Parts List Liste der Einzelteile Lista de partes Elenco delle parti Liste des pieces...
Page 25: ...25 G0706 1x G0707 1x G0708 1x G0705 1x G0704 1x G0703 1x...
Page 26: ......
Page 27: ...Stand Estar Stare in piedi Supporter 1 0 Stand...
Page 29: ...29 Napoli 7510 1 3 1 4 ZN002 ZW002 ZB007 ZB006 6x 6x 12x 12x 6x 6x...
Page 33: ...33 1 10 1 11 1 2 1 1 11 2 2 1 1 11 3...
Page 37: ...37...
Page 38: ......
Page 39: ...Bogen und Boden Arco y piso Arco e pavimento Vo te et plancher 2 0 Arch and Floor...
Page 43: ...43 2 5 2x...
Page 45: ...45 2 7 1 2x 4x...
Page 49: ...49 2 9 2 10 50 mm 2 15 mm 5 8 6x 4x 50 mm 2 15 mm 5 8 6x 2 13 2 9...
Page 51: ...51 2 13 2 14 ZS002 6x 6x...
Page 52: ......
Page 53: ...Kuppel und Kamin C pula y chimenea Cupola e canna fumaria D me et conduit 3 0 Dome and Flue...
Page 55: ...55 3 2 3 3 4x 3 15 3 3 10mm 3 8...
Page 57: ...57 3 5 3 6...
Page 59: ...59 3 9...
Page 61: ...61 3 11 3 12 ZS002 ZW002 ZN002 4x 4x 4x 29x...
Page 63: ...63 3 14 2x...
Page 65: ...65 3 16 3 17...
Page 66: ...2 2...
Page 71: ...71 4 7 ZR001 1x...
Page 73: ...73 4 11 4 10 ZR001 ZS002 1x 2x ZR001 ZS002 1x 2x...
Page 75: ...75 4 14 4 15 ZS002 29x 29x...
Page 77: ...77 4 18 ZR001 2x...
Page 79: ...79 4 21 4 22 ZR001 32x ZR001 2x...
Page 81: ...81 4 25 4 26 ZR001 14x...
Page 83: ...83 4 29 4 30 ZS002 2x ZS002 6x 2x 6x...
Page 84: ......
Page 85: ...Rendering Representaci n Rendering Le rendu 5 0 Rendering...
Page 89: ...89 5 6...
Page 91: ...91...
Page 92: ......
Page 97: ...97 0 2 5x 4x 3x 1 2 1 8 0 4...
Page 99: ...99 0 4 1 2 25 50mm 1 2 25 50mm...
Page 101: ......
Page 102: ......
Page 106: ......
Page 109: ...109 1 2 ZN006 ZW004 ZB011 3x 3x...
Page 111: ...111 1 4 ZN006 ZW004 ZB011 3x 3x...
Page 114: ......
Page 117: ...117 2 2 ZN006 ZW004 ZB011 3x 3x...
Page 119: ...119 2 4 ZN006 ZW004 ZB011 3x 3x...
Page 122: ......
Page 123: ...WARRANTY This section explains the warranty associated to the oven...