
12
www.gozney.com
+44 (0)1425 204 999
w
e
t
Unit 18 & 19, The Runway,
Christchurch, Dorset.
BH23 4FL.
Extraction option 1 - Flue
Extraction option 2 - Canopy
INTRODUCTION
A gas only oven can be extracted with two different methods.
It can have a direct twin walled flue system or an industrial
extraction canopy.
OPTION 1 - FLUE
For a direct flue the oven will require direct connection
to a 150mm (5.9 inch) internal diameter, twin walled flue
system that is appropriate for solid fuel burning. Refer to
the manufacturer’s guidelines regarding installation and
clearances.
OPTION 2 - CANOPY
When operating a Gozney Oven exclusively on gas, it may be
possible to utilise an existing or new kitchen extract system
via the use of an extraction canopy.
ALWAYS CHECK WITH YOUR EXTRACTION PROVIDER PRIOR
TO USING YOUR OVEN.
When using a canopy for extraction of gas emissions, always
ensure that the canopy is working to a sufficient level prior
to gas burner ignition. In addition, canopy extraction should
remain on for at least 5 minutes
after the gas burner flame
has been fully extinguished.
If adding any kind of facade to the oven, always ensure that
proper access is maintained, including sufficient room for
maintenance to the extraction canopy filters.
WARNING: EMISSIONS FROM THE OVEN WILL BE HOT
AND DISTANCES FROM ANY COMBUSTIBLES (INCLUDING
COMBUSTIBLE EXTRACTION COMPONENTS) MUST BE
ADHERED TO.
PRE-INSTALL
EXTRACTION
Summary of Contents for 100 x 75 Stone Core
Page 1: ...MASTER 100 X 75 VERSION 1 8 DATED 04 09 2020 INSTALLATION MANUAL EUROPE...
Page 2: ......
Page 5: ...CAUTIONS AND WARNINGS This section details the correct operation and install of a Gozney Oven...
Page 9: ......
Page 10: ......
Page 11: ...PRE INSTALL This section details how to correctly install a Gozney oven...
Page 20: ......
Page 21: ...0 0 Parts List Liste der Einzelteile Lista de partes Elenco delle parti Liste des pieces...
Page 25: ...25 G0706 1x G0707 1x G0708 1x G0705 1x G0704 1x G0703 1x...
Page 26: ......
Page 27: ...Stand Estar Stare in piedi Supporter 1 0 Stand...
Page 29: ...29 Napoli 7510 1 3 1 4 ZN002 ZW002 ZB007 ZB006 6x 6x 12x 12x 6x 6x...
Page 33: ...33 1 10 1 11 1 2 1 1 11 2 2 1 1 11 3...
Page 37: ...37...
Page 38: ......
Page 39: ...Bogen und Boden Arco y piso Arco e pavimento Vo te et plancher 2 0 Arch and Floor...
Page 43: ...43 2 5 2x...
Page 45: ...45 2 7 1 2x 4x...
Page 49: ...49 2 9 2 10 50 mm 2 15 mm 5 8 6x 4x 50 mm 2 15 mm 5 8 6x 2 13 2 9...
Page 51: ...51 2 13 2 14 ZS002 6x 6x...
Page 52: ......
Page 53: ...Kuppel und Kamin C pula y chimenea Cupola e canna fumaria D me et conduit 3 0 Dome and Flue...
Page 55: ...55 3 2 3 3 4x 3 15 3 3 10mm 3 8...
Page 57: ...57 3 5 3 6...
Page 59: ...59 3 9...
Page 61: ...61 3 11 3 12 ZS002 ZW002 ZN002 4x 4x 4x 29x...
Page 63: ...63 3 14 2x...
Page 65: ...65 3 16 3 17...
Page 66: ...2 2...
Page 71: ...71 4 7 ZR001 1x...
Page 73: ...73 4 11 4 10 ZR001 ZS002 1x 2x ZR001 ZS002 1x 2x...
Page 75: ...75 4 14 4 15 ZS002 29x 29x...
Page 77: ...77 4 18 ZR001 2x...
Page 79: ...79 4 21 4 22 ZR001 32x ZR001 2x...
Page 81: ...81 4 25 4 26 ZR001 14x...
Page 83: ...83 4 29 4 30 ZS002 2x ZS002 6x 2x 6x...
Page 84: ......
Page 85: ...Rendering Representaci n Rendering Le rendu 5 0 Rendering...
Page 89: ...89 5 6...
Page 91: ...91...
Page 92: ......
Page 97: ...97 0 2 5x 4x 3x 1 2 1 8 0 4...
Page 99: ...99 0 4 1 2 25 50mm 1 2 25 50mm...
Page 101: ......
Page 102: ......
Page 106: ......
Page 109: ...109 1 2 ZN006 ZW004 ZB011 3x 3x...
Page 111: ...111 1 4 ZN006 ZW004 ZB011 3x 3x...
Page 114: ......
Page 117: ...117 2 2 ZN006 ZW004 ZB011 3x 3x...
Page 119: ...119 2 4 ZN006 ZW004 ZB011 3x 3x...
Page 122: ......
Page 123: ...WARRANTY This section explains the warranty associated to the oven...