B Prerequisites for Software Update or Data Exchange
➭
Find the interface to which the PRO
Fi
TEST
®
C is connected.
Note
Always start this function first,
before performing an update or chang-
ing report templates
.
After starting this function, WinProfi loads the report files specifi-
cally necessary for the connected instrument. Due to the fact that
WinProfi has been created for use with several types of test instru-
ments, incorrect test reports may otherwise be loaded, or errone-
ous options may be made available.
➭
Query information regarding current software version.
C Transmission of a Software Update to the Test Instrument
➭
PC:
Select the
Update All
function from the
Update
menu. Follow the in-
structions which appear at the monitor.
Depending upon the utilized PC, transmission takes from 1 to 2 minutes.
The NETZ/MAINS LED of the
PROFi
TEST
®
C
test instrument lights up green and indi-
cates that the instrument is ready to receive data. If the PC and the test instrument are
correctly synchronized, the same LED lights up yellow. During programming sequences,
the U
L
and RCD/FI LEDs light up red and the NETZ/MAINS LED lights up yellow in alternat-
ing order. Upon completion of data transmission, the NETZ/MAINS LED briefly lights up
green, afterwards all LEDs go out.
The message „Transmission done“ appears on the computer screen.
Attention!
!
The instrument may not, under any circumstances, be switched
off during transmission, nor may the connection between the in-
strument and the PC be interrupted!