
C 5
CHANGE
NO. 5
Changes in force: C 1, C 2, C 3, C 4, and C 5
TM 5-4320-249-14
HEADQUARTERS
DEPARTMENT OF THE ARMY
WASHINGTON, D.C., 15 October 1990
Operator, Organizational, Direct Support and General Support
Maintenance Manual Including Repair Parts and Special Tools List
for
PUMP, CENTRIFUGAL, WATER; 200 GPM
( G O R M A N - R U P P C O . M O D E L 6 2 - 1 / 2 E 1 3 - 4 A 0 8 4 )
F S N 4 3 2 0 - 9 3 5 - 1 6 1 8
Approved for public release; distribution is unlimited
TM 54320-249-14, 26 June 1969 is changed as follows:
Page 2–1, Paragraph 2-4 a., add NOTE:
NOTE: Use an electrolyte with a specific gravity of 1.280. Do NOT use a
tropical electrolyte, which will reduce battery reserve capacity.
Page 2-6, Paragraph 2-15, add “f”:
f.
Increase battery PMCS frequency. Use distilled water or a good grade drinking water (excluding mineral
water).
Page 3-7, Paragraph 3-14 b. (4), add NOTE:
NOTE: Use an electrolyte with a specific gravity of 1.280. Do NOT use a
tropical electrolyte, which will reduce battery reserve capacity.
By Order of the Secretary of the Army:
CARL E. VUONO
General, United States Army
Chief of Staff
Official:
THOMAS F. SIKORA
Brigadier General, United States Army
The Adjutant General
DISTRIBUTION:
To be distributed in accordance with DA Form 12-25E, (qty rqr block no. 1405).
1/(2 blank)
Summary of Contents for 62-1/2E13-4A084
Page 4: ...PIN 008477 005...
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 35: ...Figure 1 1 Centrifugal pump model 62 1 2E13 4A084 left rear three quarter view v...
Page 36: ......
Page 41: ...Figure 2 2 Figure 2 2 2 3...
Page 47: ...3 23 3 14 Figure 3 2 Quarterly preventive maintenance services 3 3...
Page 52: ...Figure 3 7 Battery and battery box disassembly and reassembly 3 8...
Page 54: ...Figure 3 10 Fuel tank lines and fittings disassembly and reassembly 3 10...
Page 59: ...Figure 3 13 Centrifugal pump exploded view 3 15...
Page 60: ...Figure 3 14 Cross sectional view showing seal and impeller installation 3 16...
Page 68: ...SECTION II SECTION II B 4...
Page 69: ...SECTION III SECTION III A 5...
Page 70: ......
Page 71: ...SECTION II B 5...
Page 72: ...SECTION II B 6...
Page 73: ...SECTION II B 7...
Page 74: ...SECTION III TM 5 2805 259 14 B 8...
Page 76: ......
Page 97: ...FIGURE NO C2 BATTERY BOX C 21...
Page 99: ...FIGURE C4 Figure No C4 Pump C 23...
Page 100: ...FIGURE NO C5 FIGURE C5 C 24...
Page 104: ......
Page 105: ......
Page 106: ...TM 5 4320 249 14 TM 5 4320 249 14...