Gorilla Playsets Playmaker Deluxe 2470 Manual Download Page 58

L-BRACKET 

2449

3/8" Flat Washer
QTY. (2)

3/8" Lock Nut
QTY. (2)

QTY. (2)

3/8" x 3-3/4" Carriage Bolt

PARALLEL

SWING BEAM BRACKET

2447 Right

2470AF

SWING LEG

1: INSTALL BRACKETS TO SWING LEGS AS SHOWN BELOW.

 FROM EACH OTHER.

STEP 20: SWING LEGS AND BRACKETS

PARALLEL AFTER 

NOTE: DO NOT FULLY TIGHTEN FASTENERS 

NOTE: BRACKETS ARE 

OPPOSITE

AT THIS POINT.

FACING UP

THESE FLANGES 

INSTALLATION

WILL BE

2: FLIP THE SWING LEGS OVER SO THE BRACKETS 

POINT DOWN KEEPING THE FLANGES PARALLEL 

TO EACH OTHER.

3: INSTALL THE L-BRACKET TO SWING LEGS 

AS SHOWN. 

2448 Left

SWING BEAM BRACKET

3/8" x 3-3/4" Carriage Bolt
QTY. (4)

QTY. (4)

3/8" Flat Washer

3/8" Lock Nut
QTY. (4)

2470AF

SWING LEG

50

Summary of Contents for Playmaker Deluxe 2470

Page 1: ...ock wall ladder combo 2 6 wide x 2 1 5 8 high Slide opening 42 wide x 2 1 7 16 high Copyright 2020 Gorilla Playsets All Rights Reserved 120 Etowah Industrial Court Canton GA 30114 www gorillaplaysets...

Page 2: ...at are missing or damaged is to use our Quick Response Center located at www gorillaplaysets com support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY THE RETAILER DOES N...

Page 3: ...ardware is tight Instructions for proper maintenance can be found on Gorilla s website Imperfections or conditions that develop because of a failure to properly maintain the swing set are not covered...

Page 4: ...s and screw heads should be checked regularly for tightness The ground ladder rope ladder slide swings and other areas where children spend a majority of their playtime should be checked more frequent...

Page 5: ..._____________ Comments ________________________________________________________________________________________________ ________________________________________________________________________________...

Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 7: ...in sealant is available online here http www gorillaplaysets com Playground Sealant p 10 0003 htm Oil based stain or water based stain may be used Should you choose to use other stain we suggest askin...

Page 8: ...manuals html Click on your specific model http www gorillaplaysets com Warranty s 82 htm NOTE Your children s safety is our 1 concern Observing the following statements and warnings reduces the likeli...

Page 9: ...r of deck 5 9 1 4 Standing Height at outer edge of deck 4 3 5 8 Deck height 3 11 3 4 Deck Size 48 wide x 36 deep Entry opening at rock wall ladder combo 2 6 wide x 2 1 5 8 high Slide opening 42 wide x...

Page 10: ...el Boards Panel Supports and Arch Face Board Steps 13 14 Building and Mounting Rockwall Ladder Combination Steps 15 18 Swing Beam Assembly Steps 19 24 Panel Slat Installation Steps 25 26 Center Posts...

Page 11: ...hances of falling The parents should have the children dress appropriately with well fitting shoes Loose clothing such as scarves and ponchos should not be worn Always take off tie up or tuck in cords...

Page 12: ...excessive wear is found Contact us for warranted replacement parts Swing chains rings ropes etcetera should always be fastened to a rotating swing hanger NEVER attach a chain ring rope etcetera to a...

Page 13: ...he depth of the loose fill surfacing material To maintain the right amount of loose fill materials mark the correct level on play equipment support posts That way you can easily see when to replenish...

Page 14: ...loose fill surfacing materials are acceptable Surfacing materials are acceptable such as the types and depths shown in the table Fall Heights and Materials Type Of Material 6 in depth 9 in depth 12 i...

Page 15: ...re the ground around the outside edges of the sandbox boards on the high side of the fort This is the area that will be dug in Make sure to score deep enough the scored lines will be your digging temp...

Page 16: ...efective We use a high quality lumber in our structures however you should inspect each part for splinters or rough spots and sand them smooth to prevent injury After familiarizing yourself with all o...

Page 17: ...s EXAMPLE OF OFFSET HOLES UP EXAMPLE OF OFFSET HOLES DOWN Counter sunk holes Many of the parts that will be used have counter sunk holes A counter sunk hole is one that surrounds one side of a through...

Page 18: ...nut until the face of the T nut is flush to the wood This picture shows the T nut inserted and installed flush to the wood This picture shows an end view of the T nut installed flush to the wood WARNI...

Page 19: ...SHAPED END WHICH GOES INTO THE HOLE IN THE CORNER POST THE T NUT ALSO HAS A FLANGE SHAPED END WITH TEETH THE TEETH PENETRATE INTO THE CORNER POST WOOD TO PREVENT THE T NUT FROM SPINNING WHEN YOU TIGH...

Page 20: ...Trapeze Bar is 125 lbs Maximum Allowable swinging weight for a three position swing 1 The maximum allowable swinging weight at each Swing Belt position is 150 lbs 2 The maximum allowable swinging wei...

Page 21: ...fore getting started SITE PLAN Playset height 9 10 1 4 Swing Beam height 7 2 3 4 Playset Fall height 6 8 1 4 Standing Height at center of deck 5 9 3 4 Standing Height at outer edge of deck 4 3 5 8 Dec...

Page 22: ...WINGS WALL RIGHT SIDE BACK SIDE 6 SAFETY AREA 6 SAFETY AREA 6 SAFETY AREA 6 SAFETY AREA ROCK SLIDE 3 0 11 10 14 6 1 10 4 0 8 7 8 4 6 3 7 11 FRONT SIDE 2470 Playmaker Deluxe Overhead Safety Zones 2020...

Page 23: ...NTS Swings Slides Accessories ___ Qty Description ___ 2 Swingbelts w Chains ___ 1 Trapeze Swing w Chains ___ 2 Wave Slide ___ 6 Rock Wall Grips assorted colors ___ 1 Telescope ___ 1 Periscope ___ 1 Cr...

Page 24: ...EV 01 13 2020 JH PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 1 4 SPLIT LOCK WASHER QTY 2 5 16 SPLIT LOCK WASHER QTY 35 5 16 FLAT WASHER QTY 35 3 8 TORQUE WASH...

Page 25: ...Y 10 PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 14 X 1 1 4 TRUSS HEAD SCREW QTY 6 11 0113 2470 Hardware PAGE 2 OF 4 REV 01 13 2020 JH 5 16 X 2 HEX BOLT QTY 2...

Page 26: ...AGE 3 OF 4 REV 01 13 2020 JH PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 3 8 X 3 CARRIAGE BOLT QTY 2 3 3 8 X 3 3 4 CARRIAGE BOLT QTY 6 3 3 4 3 8 X 4 1 2 CARRI...

Page 27: ...GE 4 OF 4 REV 01 13 2020 JH PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 3 8 X 6 CARRIAGE BOLT QTY 2 6 3 8 X 6 1 2 CARRIAGE BOLT QTY 14 6 1 2 3 8 X 8 1 2 CARRI...

Page 28: ...ART 3 4 X 3 3 8 X 36 5 8 X 5 3 8 X 12 528 2 2 3 4 X 3 3 8 X 48 BOARD FRONT FACE 2470G 2470B SUN 5 8 X 5 3 8 X 13 5 8 2 2470C DECK SPACER 3 4 X 3 X 41 7 8 2470D TIC TAC TOE MOUNT 3 4 X 3 3 8 X 17 1 2 S...

Page 29: ...4 X 3 3 8 X 48 2470I WALL PANEL BOARD 2 3 4 X 4 1 2 X 19 2470J DECK BOARD 3 4 X 4 7 8 X 48 2470K END SANDBOX BOARD 3 4 X 5 3 8 X 36 2470L SANDBOX SEAT 3 4 X 5 3 8 X 22 2470N ROCK WALL BOARD 3 4 X 5 3...

Page 30: ...NEL SLAT 3 4 X 5 3 8 X 27 1 2 2470P ARCH FACE BOARD 3 4 X 5 3 8 X 48 2470Q SANDBOX BOARD 3 4 X 5 3 8 X 48 2470R END SANDBOX BOARD 3 4 X 5 3 8 X 75 2470S ANGLE SUPPORT 1 X 3 3 8 X 13 2470U CENTER TARP...

Page 31: ...OARD 1 X 3 3 8 X 36 2470W ROCK WALL ROPE SUPPORT 1 X 3 3 8 X 36 2470X DECK SUPPORT 1 X 3 3 8 X 36 2470Y FORT SIDE SUPPORT 1 X 3 3 8 X 40 2470Z TARP CENTER POST 1 X 3 3 8 X 43 2470AB CROSS MEMBER 1 X 3...

Page 32: ...2470AC SLIDE BLOCKS 1 X 3 3 8 X 18 2470AD ROCK WALL SIDE 1 3 8 X 3 3 8 X 50 1 2 2470AE SWING BEAM MOUNT 3 X 3 X 36 2470AF SWING LEG 3 X 3 X 95 2470AG CORNER POST 1 3 X 3 X 95 2470AI SWING BEAM 3 3 8 X...

Page 33: ...PICTURE STAMPED ID DESCRIPTION QTY 2470 2470AJ ROCK WALL CAP 5 8 X 3 3 8 X 23 7 8 1 25...

Page 34: ...2470 TIC TAC TOE 1 PERISCOPE 01 0010 03 0016 G 2 UNASSEMBLED 07 0040 G Y WAVE SLIDE 1 36 X 72 3 4 04 0039 G Y 2 TARP 05 0014 SWING BELT WITH CHAINS WITH CHAINS 07 0002 1 04 0006 G Y 1 TRAPEZE SWING T...

Page 35: ...FETY HANDLES PAIR 07 0005 G 1pr 6 rocks ROCK WALL ROCKS COLOR SIZE MAY VARY 07 0038 G Y WS 4545 2 90 BRACKET 11 9010 IRON DUCTILE SWING HANGER 11 4024 6 13 FT ROPE ROPE LADDER 10 1008 SA 3119 1 PC 3 4...

Page 36: ...GHT 11 5019 2447 1 1 SWING BEAM ANGLED PLATE LEFT 11 5020 2448 SWING BEAM 90 PLATE 11 5021 2449 1 PLASTIC GROUND STAKES PAIR 07 0016 P 3 pr 1 LOGO PLATE 11 4018 NOT SHOWN NOT SHOWN 2470 HARDWARE KIT 1...

Page 37: ...PICTURE DESCRIPTION QTY DORMER WINDOW 07 0029 G 2 1 CROWN 07 0019 CHALKBOARD 07 0018 1 1 STEERING WHEEL 07 0004 PRODUCT MAY VARY FROM IMAGE SHOWN 29...

Page 38: ...UT BEAM ROCK 1 LAY OUT EACH CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE PLAYSET SWING SLIDE FRONT ADDITIONAL NOTE POSTS HOLE IN THESE 2470AH CORNER POST 2 2470AH CORNER POST 2 2470AG CORNER PO...

Page 39: ...USE A HAMMER TO SEAT THE T NUTS AFTER INSERTING THEM INTO THE HOLES SHOWN IN THE DIAGRAM BELOW NO T NUTS IN THESE HOLES NO T NUTS IN THESE HOLES T NUT QTY 22 2470AH CORNER POST 2 2470AG CORNER POST 1...

Page 40: ...RENT BOLT LENGTHS USED BETWEEN THE TOP BOTTOM BOARDS 5 16 Split Lock Washer 5 16 Flat Washer 5 16 Split Lock Washer REMAINS EMPTY 5 16 Flat Washer 5 16 X 3 1 2 Hex Bolt 5 16 x 3 3 4 Hex Bolt 5 16 Flat...

Page 41: ...NG PLATE AS SHOWN BELOW STEP 4 SWING BEAM MOUNT COUNTERBORE HOLES FACING OUTWARDS COUNTERBORE HOLES FACING DOWN 3 8 x 3 Carriage Bolt 3 8 Flat Washer Swing Beam Flat Plate 2411 3 8 Lock Nut 2470AE SWI...

Page 42: ...THE NUTS SEE FIG 5 1 COUNTERBORE HOLES TOWARDS THE BOTTOM AND FACING THIS SIDE 5 16 Split Lock Washer 3 8 Flat Washer 5 16 Flat Washer 5 16 x 3 3 4 Hex Bolt 5 16 Split Lock Washer 3 8 Torque Washer 5...

Page 43: ...x 3 1 2 Hex Bolt FRONT OF PLAY SET 2470G FRONT FACE BOARD COUNTERBORE HOLES TOWARDS THE TOP 2470G FRONT FACE BOARD COUNTERBORE HOLES TOWARDS THE TOP STEP 6 FRONT FACE BOARDS 1 INSTALL BOARDS AS SHOWN...

Page 44: ...NT BOLT LENGTHS USED BETWEEN THE TOP BOTTOM BOARDS 5 16 Split Lock Washer COUNTERBORE HOLES COUNTERBORE HOLES 5 16 Split Lock Washer SANDBOX BOARD TOWARDS THE TOP 5 16 Flat Washer 5 16 X 3 1 2 Hex Bol...

Page 45: ...TWO FORT SIDE SUPPORTS ARE ATTACHED PROPERLY TO THE SANDBOX BOARD AND ALL PARTS ARE LEVEL AND SQUARE BEFORE SECURING THEM TO THE CORNER POSTS 5 16 Flat Washer 5 16 x 1 3 4 Hex Bolt 5 16 Split Lock Was...

Page 46: ...TEP 9 LEVELING THE PLAY SET AND ADDING SCREWS ENSURE ALL PARTS ARE LEVEL AND SQUARE BEFORE SECURING THEM TO THE CORNER POSTS START WITH DECK LEVEL PARTS FIRST LEVEL QTY 32 8 x 2 1 2 Wood Screw LEVEL 3...

Page 47: ...AKE SURE ALL BOARDS ARE EVENLY SPACED AND FLUSH TO THE CORNER POSTS 2 PLACE THE DECK SPACERS BETWEEN THE CORNER POST AND FLUSH TO THE FRONT AND REAR FACE BOARDS 2470J DECK BOARDS QTY 6 2470C DECK SPAC...

Page 48: ...RINGER UNDERNEATH THE CENTER OF THE DECK BOARDS NOTE USE THE HOLES AT THE CENTER OF THE FRONT FACE BOARDS AS A GUIDE TO CENTER THE STRINGER QTY 8 8 x 1 1 2 Wood Screw TOP OF DECK QTY 4 STRINGER 2470T...

Page 49: ...3 Wood Screw QTY 16 8 x 1 1 2 Wood Screw FLUSH 2470S ANGLE SUPPORT QTY 8 STEP 12 ANGLE SUPPORTS 1 INSTALL BOARDS AS SHOWN BELOW NOTE TWO DIFFERENT SCREW LENGTHS ARE USED FOR ANGLE SUPPORT ASSEMBLY Dec...

Page 50: ...NSTALL FIRST QTY 2 2470F PANEL SUPPORT INSTALL THIRD QTY 3 2470H INSTALL SECOND 2470F 2470F STEP 13 PANEL BOARDS AND PANEL SUPPORTS 1 INSTALL BOARDS AS SHOWN BELOW NOTE ORDER OF INSTALLATION ALL BOARD...

Page 51: ...HOWN BELOW 2 IMPORTANT USE ONLY TWO SCREWS TO TEMPORARILY INSTALL 2470F ALL BOARDS MUST BE PARALLEL AND FLUSH TO EACH OTHER TO FLUSH QTY 8 8 x 2 1 2 Wood Screw DECK TOP EDGE ONLY TWO SCREWS AT THIS TI...

Page 52: ...WAY 2 HAMMER T NUTS INTO THE HOLES STEP 15 ROCK WALL ROCK WALL SIDE 5 16 Flat Washer 2470AD FACING UP Bracket 11 9010 5 16 x 1 1 2 Hex Bolt 2470AD 5 16 T Nut ROCK WALL SIDE DO NOT FULLY TIGHTEN THE HE...

Page 53: ...HOLES QTY 24 ROCK WALL SIDES 2470AD 2470N ROCK WALL BOARD BOTTOM ROCK WALL BOARD QTY 5 2470M 8 x 2 Wood Screw ROPE HOLE STEP 16 ROCK WALL 1 POSITION THE ROCK WALL BOARDS ON TOP OF THE ROCK WALL SIDES...

Page 54: ...1 4 Hex Bolt 1 4 T Nut 1 4 Split Lock Washer ROCK WALL BOARD 1 4 Flat Washer ROCK ROCK STEP 17 ROCK WALL 1 THE ROCKS MUST BE LINED UP TO THE ROCK WALL STAGGERED HOLES SEE DIAGRAM BELLOW FOR MORE DETA...

Page 55: ...HE ROCK WALL SIDES 2 FLUSH THE TOP OF THE ROCK WALL CAP AGAINST THE TOP ROCK WALL BOARD 3 SECURE AS SHOWN 8 X 1 1 4 Wood Screw Wood Screw 8 X 1 1 4 Wood Screw 2450AJ 8 X 2 ROCK WALL CAP Wood Screw 8 X...

Page 56: ...A 3 8 HOLE THROUGH THE PANEL SUPPORT TEMPLATE STEP 18 ROCK WALL TO FORT 1 PLACE THE ROCK WALL CENTERED ON THE RIGHT SIDE ON THE FORT THE BOTTOM EDGE OF THE GREEN BRACKETS SHOULD BE 3 4 ABOVE THE BOTTO...

Page 57: ...THE IRON DUCTILE WITH THE HOLES IN THE SWING BEAM STEP 19 SWING BEAM IRON DUCTILE FULLY TIGHTEN ALL HARDWARE 3 8 Flat Washer 3 8 Torque Washer 3 8 Lock Nut SWING BEAM 3 8 x 6 1 2 Carriage Bolt 2470AI...

Page 58: ...LEGS AND BRACKETS PARALLEL AFTER NOTE DO NOT FULLY TIGHTEN FASTENERS NOTE BRACKETS ARE OPPOSITE AT THIS POINT FACING UP THESE FLANGES INSTALLATION WILL BE 2 FLIP THE SWING LEGS OVER SO THE BRACKETS P...

Page 59: ...S MEMBER 1 INSTALL CROSS MEMBER TO SWING LEGS AS SHOWN BELOW DO NOT FULLY TIGHTEN FASTENERS 2470AB CROSS MEMBER QTY 2 5 16 Split Lock Washer QTY 2 5 16 Flat Washer 5 16 x 3 3 4 Hex Bolt QTY 2 5 16 T N...

Page 60: ...KETS LEFT RIGHT AS SHOWN IN THE DIAGRAM BELOW SWING A FRAME UP VIEW FROM UNDERNEATH QTY 2 3 8 Flat Washer QTY 2 3 8 Lock Nut QTY 2 3 8 x 6 1 2 Carriage Bolt 3 8 Torque Washer 3 8 Flat Washer 3 8 Lock...

Page 61: ...olt 3 8 Torque Washer STEP 23 MOUNT SWING BEAM TO FORT AN EXTRA PERSON IS NEEDED FOR THIS STEP 1 PLACE THE SWING BEAM ON TOP OF THE SWING BEAM PLATE SWING BEAM SUPPORT NOTE FULLY TIGHTEN ALL FASTENERS...

Page 62: ...LEVEL STEP 24 LEVELING THE SWING BEAM MAKE SURE SWING BEAM IS LEVEL 54...

Page 63: ...8 x 1 1 4 Wood Screw QTY 16 2470O PANEL SLAT QTY 4 STEP 25 PANEL SLATS 1 INSTALL ALL PANEL SLATS AS SHOWN IN THE DIAGRAM BELOW SWING BEAM PANEL 2 1 2 1 1 2 1 2 1 1 2 55...

Page 64: ...STEP 26 PANEL SLATS 1 INSTALL ALL PANEL SLATS AS SHOWN IN THE DIAGRAM BELOW REAR PANEL 12 1 2 2 2 2 2 8 x 1 1 4 Wood Screw QTY 16 2470O PANEL SLAT QTY 4 56...

Page 65: ...RS HERE ON BOTH SIDES QTY 4 8 x 1 1 2 Wood Screw SPEED SQUARE 90 90 SUPPORTS TARP CENTER POST THE REAR TARP 2450AB UP USE THIS HOLE TO SECURE TO THIS HOLE WILL REMAIN EMPTY NOTE PRE DRILLS STEP 27 CEN...

Page 66: ...F FORT TARP CENTER POST FLUSH FLUSH FLUSH 8 x 1 1 4 Wood Screw FLUSH 11 1 2 11 1 2 1 1 2 2470E Wall Panel Board 1 2470E Wall Panel Board 1 2470I Wall Panel Board 2 2470I Wall Panel Board 2 STEP 28 WIN...

Page 67: ...STEP 29 WINDOWS 1 CENTER EACH WINDOW SIDE TO SIDE IN THE OPENING QTY 2 Window FLUSH 8 x 1 Wood Screw QTY 8 59...

Page 68: ...QTY 12 8 x 2 1 2 Wood Screw FLUSH HERE FLUSH HERE 2470V END BOARD 2470V END BOARD 2470U CENTER TARP BOARD STEP 30 TARP BOARDS 1 ATTACH BOARDS TO PLAY SET AS SHOWN BELOW 60...

Page 69: ...ND CENTERED FLUSH AND CENTERED 2470B SUN QTY 2 8 x 1 Wood Screw QTY 2 Crown QTY 1 STEP 31 SUN 1 EACH SUN MOUNTS ON TOP OF THE REAR TARP SUPPORT BOARDS CENTERED FROM SIDE TO SIDE 2 PLACE THE PLASTIC SU...

Page 70: ...AN HEAD SCREWS WITH A 1 8 DRILL BIT 1 PLACE THE TARP ACROSS THE TARP BOARDS WITH THE HEMS ON THE INSIDE N 2 FOLD THE FLAP UNDER THE TARP BOARD Wood Screw QTY 6 14 x 1 Pan Head 1 4 Flat Washer QTY 6 Pa...

Page 71: ...ROOF PEAK SUPPORT QTY 4 QTY 2 2470A 8 x 1 1 4 Wood Screw FLUSH AND CENTERED STEP 33 ROOF PEAK SUPPORT 1 PLACE THE ROOF PEAK SUPPORT FLUSH AND CENTERED AT THE TOP OF THE TARP 63...

Page 72: ...34 TIC TAC TOE ASSEMBLY 1 CENTER AND FASTEN THE TIC TAC TOE MOUNTS TO THE GREEN TIC TAC TOE BRACKETS WITH THE SHORT SCREWS PROVIDED IN THE TIC TAC TOE BOX 2 ASSEMBLE THE TIC TAC TOE ACCORDING TO THE...

Page 73: ...8 x 1 1 4 Wood Screw QTY 8 2 STEP 35 MOUNTING TIC TAC TOE PANEL 1 PLACE THE TIC TAC TOE PANEL ASSEMBLY ONTO THE BACK WALL THE LOWER TIC TAC TOE MOUNT BOARD SHOULD BE 2 ABOVE THE DECK 65...

Page 74: ...G WHEEL 3 SECURE THE STEERING WHEEL TO THE SWING BEAM WITH THE WASHER AND THE LAG SCREW DO NOT OVER TIGHTEN THE LAG SCREW INTO THE STEERING WHEEL OR IT WILL NOT TURN 3 SNAP THE STEERING WHEEL CAP INTO...

Page 75: ...E INCLUDED WITH CHALKBOARD QTY 4 STEP 37 CHALKBOARD 1 ATTACH CHALKBOARD TO THE SLATS UNDER STEERING WHEEL NOTE CHALKBOARD COMES WITH A MAGNETIC CHALK HOLDER WHICH WILL STICK TO THE CHALKBOARD DO NOT O...

Page 76: ...H SO THAT IT CAN NOT BE LOOPED BACK ON IT SELF KEEP TYING GRANNY KNOTS AT THE BOTTOM END OF ROPE UNTIL THERE IS NO REMAINING LOOSE ROPE DO NOT CUT ENDS OF ROPE TIE A FIGURE 8 KNOT BEHIND THIS HOLE ROP...

Page 77: ...G KITS NOTE IGNORE INSTRUCTIONS INCLUDED WITH FLAG KIT 1 INSTALL THE FLAG KITS ON THE CORNER POSTS AT THE FRONT OF THE FORT 2 ATTACH THE FLAG KITS WITH THE HARDWARE PROVIDED WITH THE FLAG KIT FLAG FLU...

Page 78: ...SLIDE BLOCK UNDERNEATH THE DECK SPACER AGAINST THE ANGLE SUPPORT 1 PRE DRILL 1 8 DIAMETER HOLES INTO THE DECK SPACER AS SHOWN IN THE DIAGRAM BELOW STEP 40 SLIDE BLOCKS 8 x 1 1 2 Wood Screw DECK SPACER...

Page 79: ...EW 1 4 WASHER SAFETY HANDLE YOU MAY DRILL 5 32 PILOT HOLES THROUGH THE CENTER OF EACH HOLE FOR THE SCREWS SAFETY HANDLE 7 7 STEP 41 SAFETY HANDLES 1 ATTACH EACH SAFETY HANDLE TO THE CORNER POST WITH T...

Page 80: ...SCREWS 14 X 1 1 4 TRUSS HEAD SCREWS DO NOT OVER TIGHTEN MAKE SURE SLIDES ARE TIGHT TOGETHER 1 PLACE THE SLIDES CENTERED IN THE OPENING LAY THE SLIDES ON THE DECK WITH THE LIP EXTENDING ONTO THE DECK S...

Page 81: ...BEAM AS SHOWN BELOW EXCESS CHAIN MAY BE LOOPED AND HOOKED ONTO THE END OF THE SWING HANGER HOOK 2 ATTACH THE NAME PLATE TO THE MIDDLE OF THE SWING BEAM WITH TWO 1 1 4 WOOD SCREWS WITH CHAINS TRAPEZE B...

Page 82: ...BOTTOM OF THE PERISCOPE 2 SNAP THE PERISCOPE INTO THE PERISCOPE BRACKET THE PERISCOPE BRACKET SHOULD BE IN BETWEEN THE WARNING DO NOT LOOK INTO SUN OR OTHER BRIGHT LIGHTS WITH PERISCOPE STEP 44 PERISC...

Page 83: ...1 ATTACH TELESCOPE AS SHOWN BELOW STEP 45 TELESCOPE PROVIDED WITH TELESCOPE SIDE OF THE TELESCOPE SOCKETS ON THE TELESCOPE 2 WOOD SCREW TELESCOPE BASE SNAP THE ENDS OF THE BASE INTO THESE 75...

Page 84: ...O EACH SWING LEG AT AN ANGLE AS SHOWN IN THE DIAGRAM BELOW NOTE ALL ANCHORING DEVICES MUST BE PLACED BELOW THE LEVEL OF THE PLAYING SURFACE TO PREVENT TRIPPING OR INJURY RESULTING FROM A FALL IF SANDY...

Page 85: ...1 INSTALL BOARDS AS SHOWN BELOW STEP 47 SANDBOX SEATS 8 x 2 Wood Screw QTY 8 2470L SANDBOX SEAT QTY 2 77...

Reviews: