
SANDBOX BOARD, THROUGH THE HOLES AT 4-1/2”, AND INTO THE PREVIOUSLY INSTALLED T-
NUTS. (THE BOTTOM HOLES WILL NOT BE USED AT THIS TIME)
1: ATTACH THE 2 X 6 X 70" SANDBOX BOARD WITH HOLES OFFSET UP TO THE FRONT CORNER
POSTS WITH 5/16 X 4-1/2” HEX BOLTS AND 5/16” WASHERS THROUGH THE TOP HOLES OF THE
2: ONCE THE FRAME IS LEVEL, SQUARE, AND SET INTO POSITION YOU MAY GO BACK
THROUGH AND INSERT THE 5/16 X 3-1/2” LAG SCREWS AND 5/16” WASHERS IN ALL OF THE
REMAINING HOLES OF THE PREVIOUSLY INSTALLED 2 X 6 PARTS. NOTE: THERE WILL NOT BE
ANY PRE- DRILLED HOLES IN THE CORNER POSTS FOR THESE LAG SCREWS. LAG SCREWS ARE
SELF-TAPPING.
STEP 6: COMPLETING THE FRAME
LAG SCREW
OFFSET HOLES UP
5/16" WASHER
SANDBOX BOARD
HEX BOLT
5/16 X 4-1/2"
2 X 6 X 70"
5/16 X 3-1/2"
5/16" WASHER