CONNECTION TO THE POWER SUPPLY NETWORK
HEAT PUMP OPERATION
In order to connect the hot water storage tank with the heat pump to the power supply network first install an electrical socket
suitable for the current load of 16 A.
Connecting the heat pump to the power supply network must take place in accordance with the standards for electric appliances.
To comply with the national installation regulations, an all poles disconnect switch must be installed between the heat pump and
the power supply network.
The heat pump can be operated using an LCD touch screen (Fig. 10). If you press anywhere on the screen, the screen lights up.
When the screen is lit up, the operation fields are active.
When the heat pump is connected to the water and power supply mains and the boiler is filled with water, the heat pump is ready
to be used. The heat pump heats the water in the range 10 °C - 65 °C. From 65 °C - 75 °C the water is heated by electrical heaters
(models ZG and ZGNT).
LEGEND
T1
Bar with sensors
T2
Evaporator – temp. sensor
T3
Air temperature sensor
1
4-way valve (Models ZGNT)
2
Compressor
3
PV function
4
Fan
5
Electric heating element (2 x 1000W)
(Models ZG and ZGNT)
6
Thermal cut-out
7
Magnesium anode
8
LCD touch screen
9
Housing - ground
(in case of a metal casing)
10
Boiler - ground
LEGEND
1
Signalization of the operation of solar collectors
2
Alternative source of heating/turned on
3
Signalization of the backup operation
4
Indication, overview of operation errors, entrance
into the service menu
5
Display and setup of temperature in °C
6
Start and setup of the VACATION programme
7
Day of the week
(1 .. Monday, …, 7 .. Sunday)
8
Reducing the value
9
Heat pump on/off switch
10
Increasing the value
11
TIMER start and setup
12
Time setup and display
13
Start-up of quick heating "TURBO"
14
Indicator of the heating element operation
15
Start-up of heating to the maximum temperature
level
16
Signalization of compressor operation
17
Signalization of anti-legionella programme operation
18
Warm water quantity display
19
Signalization of defrosting
20
Signalization of fan operation
Figure 9:
Connection to the power supply network
Figure 10:
Operation display
1
16
2
15
3
14
4
13
5
12
6
11
20
7
19
8
18
9
17
10
C
o
T1
T2
T3
4
6
9
10
7
8
5
1
R
C
S
1
K10
K3
K7
K11
K6
K1
K9
K4
QUART
PROG.
BUZZ1
K5
FAS3 FAS2
FAS1
1000W
1000W
FAS4
FAS5
2
1
1
2
3
4
1
2
3
4
1
1
2
1
2
3
4
2
3
4
5
2
2
N
L
3
29
EN
542902
Summary of Contents for TC 200 Series
Page 56: ...TC 200 300 10 2019 542902...