Shenzhen Gooxi Technology Co., Ltd.
/ Note: In the flat push-in process, there is a buckle on each side of the sliding rail
on both sides. The left buckle is lifted upwards, and the right buckle is pressed
downwards to continue pushing. As shown below:
5.
Lock the fixing screw, as shown below:
The left side of
the
buckle
is
lifted up
Press down on the
right side
Summary of Contents for ST401-S36REH-G2
Page 12: ...Shenzhen Gooxi Technology Co Ltd...
Page 29: ...Shenzhen Gooxi Technology Co Ltd place...
Page 41: ...Shenzhen Gooxi Technology Co Ltd...
Page 43: ...Shenzhen Gooxi Technology Co Ltd...
Page 48: ...Shenzhen Gooxi Technology Co Ltd...
Page 50: ...Shenzhen Gooxi Technology Co Ltd Installation complete diagram...
Page 51: ...Shenzhen Gooxi Technology Co Ltd...
Page 54: ...Shenzhen Gooxi Technology Co Ltd...