Summary of Contents for SEC1000S

Page 1: ...SEC1000S USER MANUAL Smart Energy Controller...

Page 2: ...bols 2 Safety and Warning 3 Mounting 4 Troubleshooting 5 Technology parameter 6 Relevant Certification 01 01 02 3 1 Mounting Instruction 3 2 Overview and Packaging 3 3 Inverter Installation 02 03 10 1...

Page 3: ...ponents must meet the requirements of SEC1000S Otherwise GoodWe will not assume the responsibility and quality assurance for the personal harm Make sure that the AC input voltage and input current mat...

Page 4: ...m gas and dust sufficient to corrode metals and destroy insulation SEC1000S parameters and warning signs must be clearly visible after installation SEC1000S should be installed without sunshine rain a...

Page 5: ...ilated SEC1000S can be placed horizontally or installed vertically The SEC1000S must be installed vertical or with a backward tilt less 15 No sidwways tilt is allowed The connection area must point do...

Page 6: ...3 Hole size Upward 200mm Downward 500mm Front 500mm Both sides 200mm 200mm 200mm 200mm 1 Drill holes on the wall 8mm in diameter and 45mm deep Refer to Figure 3 3 2 1 2 Fixthewallmountingbracketonthe...

Page 7: ...ter No more than 25 mm B Cross Sectional Area of Copper Wire R ecommend AWG11 AWG13 C Wire Length About 45 mm D Length of Bare Copper Wire About 12mm 10mm for PE NO Range of current tested Content Rem...

Page 8: ...ng use the fire proof mud to seal the port to ensure its protective performance Descriptions of internal communication ports of SEC1000S are as following Note The system supports up to 10 inverters pl...

Page 9: ...ery cable AC cable backup side Back Up Loads Back Up Loads Back Up Loads Back Up Loads Back Up Loads Back Up Loads Back Up Loads Note No separate Smart Meter is required in inverter paralleling system...

Page 10: ...dynamic IP mode he she only needs to connect the SEC1000S NET port to the Router LAN port with the network cable to connect to the network namely plug and play 2 If the user has a static IP it is nec...

Page 11: ...nnection such as output active power output current and output voltage 3 3 5 2 PV Master configuration for paralleling application inverter You should set communication address for every inverter in t...

Page 12: ...the short cable 5 Technology parameter 6 Relevant Certification Name SEC1000S Smart Energy Controller 1000S Technology parameter Input voltage range Phase voltage AC60V 280V Line voltage AC100V 480V I...

Page 13: ...90 Zijin Rd New Distric Suzhou 215011 China T 400 998 1212 service chn goodwe com cn www goodwe com cn service au goodwe com cn www goodwe com cn service nl goodwe com cn www goodwe com cn enquiries...