![Golfsport GSK Setup Manual Download Page 2](http://html1.mh-extra.com/html/golfsport/gsk/gsk_setup-manual_2241448002.webp)
1. Connect the Tubes:
In the Package Box 1 and 2 you find 45x45mm Tubes
6 x 150 cm =
4ft 11in = Label E
6 x 125 cm =
4ft 1in =
Label A
2 x 120,5 =
3ft 11in = Label B
2 x 111 cm =
3ft 7in=
Label C
2 x 130 cm =
4ft 3in =
Label D
also you have
7 Flat Profile Steel connectors to connect the Tubes together.
You first connect this Tubes with the Tube Connectors!
So you have tubes of the below sizes ready to install.
You can see on the Sketch on Sketch Pages later in this docuiment where the Tubes are Finaly
located
3 x 300 cm / 9ft 10in
= 150 cm + 150 cm Tubes
= Use Tube E+E
2 x 250 cm / 8ft 2in
= 125 cm + 125 cm Tubes
= Use Tube A + A
2 x 245,5 cm / 8ft 1in
= 125 x 120,5 cm Tubes
= Use Tube A + B
2 x 130 cm / 4ft 3in
= 130 cm Tube
= Tube D
2 x 111 cm / 3ft 7in
= 111 cm Tube
= Tube C
Now you are ready to build the GSK Golf Box.