14
16. Attach the Top Frame (6) to the Weight Guides
(31) with two M10 x 43mm Bolts (65), two M10
Curved Washers (86), and two M10 Locknuts
(74).
See step 15.
Tighten the M10 Locknuts (74).
16
74
65
65
86
86
31
6
17.
Note: For clarity, the Top Cover (27) is not
shown.
Route the Burn Cable (45) over two Burn
Pulleys (68).
Attach each Burn Pulley (68) to the right side of
the Top Frame (6) with an M10 x 40mm Bolt (97)
and an M10 Locknut (74).
17
6
68
68
74
45
97
Summary of Contents for GGSY04510.1
Page 42: ...42 NOTES...