![Goldline aqua trol Instruction Manual Download Page 3](http://html1.mh-extra.com/html/goldline/aqua-trol/aqua-trol_instruction-manual_2240915003.webp)
2019-2628
2019-10-10
Compatibility
The T-Cell-5 electrolytic chlorine generator cell is designed to work with the Aqua Trol Above-
Ground Pool Automation, PCP 28593. The kit includes a Turbo Cell, flow switch, and 5 cm (2")
cell unions for installation.
Plumbing
Turbo Cell
The Turbo Cell (used for chlorine generation) should be plumbed AFTER the filter and heater. If
installed on a pool/spa combination system, the cell should be plumbed BEFORE the pool/spa
return valve in order to allow proper chlorination of both the pool and the spa. Refer to plumbing
diagram below:
{Diagram}
The cell may be mounted vertically or horizontally, and water can move in either direction through
the cell. Install using the
5 cm (2")
unions provided. Tighten unions
BY HAND
for a watertight
seal. For systems under
5 cm (2")
plumbing, use adaptors (provided by installer).
Flow Switch
The flow switch must be plumbed in the same section of plumbing as the Turbo Cell. The flow
switch is a safety device that ensures that water is flowing through the cell before the Aqua Trol
Above-Ground Pool Automation starts to generate chlorine. Failure to properly install the flow
switch can result in explosive gases accumulating in the pool plumbing system. There must be at
least a
12" (30cm)
straight pipe run before (upstream) the flow switch. To ensure proper operation,
verify that the arrow on the flow switch points in the direction of water flow.
Summary of Contents for aqua trol
Page 24: ...2019 2628 2019 10 10 ...