![GOK 13512 Series Installation And Operating Manual Download Page 2](http://html1.mh-extra.com/html/gok/13512-series/13512-series_installation-and-operating-manual_2239119002.webp)
Installation and Operating Manual
Art. No. 13512-.../13513-...
Version 10.2012 Page 2
DESIGN
The GS Pro-Fi 3 consists of the following individual assemblies:
•
Deaeration device within the deaerator cover and the housing
•
Deaerator screw
①
at deaerator cover
②
,
only used during start-up
•
Filter
⑦
inside the filter cover
⑧
,
filter elements consisting of any of the following materials: felt, sintered
plastic, stainless steel, easy-change filter, or micro-filter
•
Filter cover and filter are available either in standard or in long version (with the exception of easy-change
filter and micro-filter)
•
Check valve in the input port
⑤
•
Quick-acting valve
⑥
integrated in the housing
•
Fixing panel
⑨
for wall mounting in both installation directions
•
Connections
⑤
,
⑩
, and
⑪
for mounting of pipe or hose lines, depending on the design
OPERATING
MEDIA
Kerosene C2 and Gas oil D
acc. to BS 2869
Kerosene C2 and Gas oil D with max. 30 % FAME
acc. to EN 14213 or EN 14214
FAME
acc. to EN 14213 or EN 14214
Bio-Liquids for combustion purposes
acc. to OPS 24
Diesel
acc. to EN 590
CONNECTIONS
Connection
Dimension
according to standard
④
Manometer
blindscrew
Female thread G 1/8 with O-ring
EN ISO 228-1
⑤
Tank line
(tank side)
Female thread G 3/8
EN ISO 228-1
Cutting ring connection RVS 6 (RVS 8, RVS 10)
EN ISO 8434-1
GOK universal connection fittings UA 6/8/10 mm
Screwed clamping ring connection, brass
Initial testing of construction
products by a notified body (ÜHP)
⑪
Burner flow line
Female thread G 3/8 or
male thread G 3/8 A with A-KN (60° inside cone)
EN ISO 228-1
prEN 12514-4:2009
⑩
Burner return line
LABELING
The GS Pro-Fi 3 bears the following labels:
Label
Significance
Explanation
Manufacturer’s sign
GOK Regler- und Armaturen-Gesellschaft mbH & Co. KG
Tank line
⑤
Connection of the pipeline on container side, flow direction indicated
Burner flow line
⑪
Connection for pipe/hose line, flow direction indicated
Burner return line
⑩
Connection for pipe/hose line, flow direction indicated
The label on the upper filter cover shows the flow diagram and the version of the GS Pro-Fi 3
with the stated article number.
The Ü sign is the evidence of initial testing of construction products by a notified body (ÜHP)
pursuant to Construction Regulation List A Part 1.
Test report no.
S 51 2005 Z2
by TÜV Immissionsschutz und Energiesysteme GmbH
DIN CERTCO Certificate of Conformity, register number
2Y115/05
with EN 12514-2:2000
Certification Program Oil Supply Systems for Oil Burners
PA/4186/05 - Test report quality label “PROOFED BARRIER“ by Fraunhofer-Institut
Verfahrenstechnik und Verpackung of 2005-12-15 / see Annex 2
This device meets the requirements of the OFTEC OIL FIRING PRODUCT STANDARD
OPS 23 :11-2007 / see Annex 1