Summary of Contents for iK VECTOR CONTROL
Page 4: ...NEW ADVANCED MATERIALS and New MANUFACTURING PROCESS...
Page 6: ...A B B 1 ASSEMBLY...
Page 7: ...1 ASSEMBLY 1 1 Straps 1 2 Hose...
Page 8: ...1 ASSEMBLY 1 3 Tie all nuts tightly 1 4 Nozzle Orientation...
Page 9: ...1 ASSEMBLY 1 5 Nozzle Protector 1 6 Parking Lance OPEN CLOSE...
Page 10: ...1 ASSEMBLY 1 7 Hose Parking 1 8 Nozzle storage box...
Page 11: ...2 CARRYING 2 1 BACK or ONE Shoulder 2 2 Strap length rregulation In the BACK One Shoulder...
Page 12: ...3 FILLING AND PRESSURIZING 3 1 Release pressure before opening the tank 3 2 Pump parking...
Page 14: ...4 CALIBRATION AND SPRAYING 4 1 Nozzle Protector 4 2 Calibration...
Page 16: ...5 SPRAYING TECHNIQUE...
Page 18: ...6 CLEANING AND MAINTENANCE Nozzle cleaning MAINTENANCE OIL or GREASE...
Page 20: ......