Gocycle G2 MotorFork Guide 1.0
© Karbon Kinetics Limited. All Rights Reserved.
14
C
ONTROLLER
R
EPLACEMENT
6.1. Install the three
pieces of Heat Shrink
(2345) over each of
the three phase wires
as shown.
6.2. Align the three
phase wires as
shown ready to
connect to the three
Motor wires.
6.3. Align the
connectors and press
them together as
shown. Ensure that
the connectors have
fully engaged
beneath the Heat
Shrink.