Assembly Guide: G2 Kickstand
© Karbon Kinetics Limited. All Rights Reserved.
6
3.
K
ICKSTAND
I
NSTALLATION
3.1. Use the supplied stud
installation wire and insert
it through the stud
locating hole.
Leave a short length of
wire protruding from the
stud locating hole and a
long length protruding
from the rear of the
frame, as shown.
3.2. Thread the Kickstand
Stud (B) onto the end of
the stud installation wire
and tie a knot as
demonstrated. Tie the
knot close to the entrance
of the battery hole as
shown.
3.3. Pull the top end of
the stud installation wire
and pull the stud through
the locating hole.
Leave a short tail of wire
protruding out the rear of
the frame, as shown.