
GOLED
- 8 -
WWW.GOBOSERVICE.COM
3.2.
INSTALLATION AND CONNECTION
Fig. 2
For the installation and connection to the mains supply of
Goled perform the following steps:
1.
Unscrew the two screws placed on the sides of the
projector base. (Fig.2)
2.
Remove the mounting plate and attach to the
desired surface.
3.
Run the cable through the cable hole in order to
bring it closer to the internal power supply.
4.
Connect the cable to juction terminal block of the
power supply. Use only 220/240V-50/60Hz input
voltage.
5.
Attach once again the projector to the mounting
plate screwing the two screws previously removed in
step 1.
WARNING: Ensure that the projector is fully closed in the
correct way before turning it on.
3.3.
GOBO INSTALLATION
The gobo has two main parameters that allow its mounting on
projectors; these parameters, shown in Fig.3, are:
-
the OD (Outer Diameter), which is the physical gobo diameter
-
the ID (Inner Diameter), the circle diameter within which the
image has to be contained.
For GOLED gobos must have the following features:
OD = 37,5mm
ID = 30mm.
In case of gobo with particular graphic details always contact
Goboservice Customer Service
which will
suggest you the more efficient configuration.
Fig.3
During gobo installation /substitution it is necessary to place the gobo with the REFLECTING SIDE always
FACING the LAMP; on contrary, the MATTED (BLACK/GREY) SIDE MUST FACE THE PROJECTOR LENS
(see Fig.4). This mounting rule allows the correct usage of gobo avoiding its breaking.
Summary of Contents for GOLED
Page 2: ... 2 WWW GOBOSERVICE COM ...
Page 16: ...GOLED 16 WWW GOBOSERVICE COM ...