J
Ju
un
niio
orr H
Ho
oo
op
p IIn
ntte
errn
na
all J
Ja
ac
ck
k S
Sy
ys
stte
em
m IIn
ns
sttrru
uc
cttiio
on
ns
s
880000..336622..G
GO
OA
ALL ((44662255))
w
ww
ww
w..g
go
oaallsseetttteerrssyysstteem
mss..cco
om
m
1133
H
HE
EIIG
GH
HT
T IIN
ND
DIIC
CA
AT
TO
OR
R A
AT
TT
TA
AC
CH
HM
ME
EN
NT
T
P
PE
ER
RM
MA
AN
NE
EN
NT
T C
CR
RA
AN
NK
K H
HA
AN
ND
DLLE
E A
AT
TT
TA
AC
CH
HM
ME
EN
NT
T
S
Stteep
p 11::
Position top of rim 3' above
playing surface using crank handle.
Measure distance with a tape measure
for accuracy.
S
Stteep
p 22::
Insert height decal
11
with
printed number ‘3’ through indicator
hole in pole and attach to internal height
indicator plate.
S
Stteep
p 33::
Repeat steps for 4', and 5' rim
heights. Use height decals with printed
numbers ‘4’ and ‘5’.
S
Stteep
p 44::
Install rubber grommet
22
into
indicator hole.
S
Stteep
p 55::
Attach UP/DOWN decal
33
to
pole above crank handle hole.
S
Stteep
p 11::
Insert shoulder bolt jack shaft
extension
44
into tapped hole on jack
shaft. Tighten with 1/8" hex key
(provided).
S
Stteep
p 22::
Attach handle
55
to shaft using
set screws
66
and 5/64" hex key
(provided).
33
66
66
55
11
22
44