STEP 4:
Properly Setting the Pump
for Inflation.
Attach light module to the top end of the structure
and fully tighten the butterfly bolt to ensure it is fully
secured.
STEP 5:
Attaching the Light.
4
Take the hose and place it into the INFLATE port on
the pump handle and push the other end into the
Torch valve opening. The top of the pump states
which side is for inflation and deflation.
Once
inflated, screw the valve cap back on.
Note:
The pump hose does not need to be
forcefully inserted into the opening, doing this
may damage your valve.
Stand the inflated stanchion as shown.
STEP 6:
Standing the Gamemaker
Torch.