800-350-8739
MBRPMM106H Rev. A.1
Page 13
www.braveproducts.com
800-350-8739
6.
Move the engagement lever into the "MIX" position and load the mixer.
Do not pour material
before paddles are spinning, this can result on mixer damage and
will void the unit warranty.
7.
After loading a batch of mortar, it is recommended to add water before adding a second
bag.
8.
After discharging the final batch of mortar, add water to the drum while the mixer is
running. Discharge the water after to clean excess material.
9.
Additional cleaning may be needed.
9. ADDING FLUIDS AND TOWING
GAS ENGINE
1.
Move the engagement lever to the "IDLER" position and lock drum.
2.
Turn the stop switch to the off position located on the engine shroud.
3.
Close the fuel valve, located on engine.
4.
Add oil, if needed to continue operation / Drain oil if need oil change.
5.
Add gasoline if needed.
STOP THE ENGINE OR ELECTRIC MOTOR BEFORE:
1.
Adding fuel/Oil.
2.
Leaving equipment unattended for any amount of time.
3.
Making any repairs or adjustments to the unit.
4.
Transportation.
BEFORE TOWING:
1.
Make sure the axle and tow bar hardware are tight.
2.
Check the condition of the pin on the tow bar and make sure it is secured.
3.
Remove any loose debris from the mixer.
4.
Use safety chains when towing.
TOWING:
1.
Stop the engine or electric motor.
2.
Close and hook the engine should.
3.
Rotate the drum into the tow position and secured it with the locking pin.
4.
Secure the mixer hitch and safety chains to the vehicle.
MAXIMUM TOW SPEED: 45 mph (72 Km/h)