Section
3DJH
0DFKLQH,QVSHFWLRQVDQG0DLQWHQDQFH
3UH6WDUW,QVSHFWLRQ&KHFNOLVW
The operator must conduct a thorough Pre-Start Inspection of the machine before each work shift.
*HQHUDO,QVSHFWLRQ&KHFN/LVW
,QLWLDO
'HVFULSWLRQ
Check that the operator’s, safety, and responsibilities manuals are in the storage container located
on the platform.
Perform a visual inspection of all machine components. Look for missing parts, torn or loose hoses,
hydraulic fluid leaks, torn or disconnected wires, damaged tires etc.
Check all structural components of the machine for cracked welds, corrosion and collision damage.
Check the security and condition of the lanyard attachment points.
Check all hoses and the cables for worn or chafed areas.
Check the platform rails and sliding mid-rail entry for damage or modification.
Check that all warning and instructional decals are legible and secure.
Check the tires for damage.
Check the lower limit switch for visual damage or loose or missing hardware.
All structural components, pins and fasteners are present and properly tightened.
)OXLG/HYHO&KHFNOLVW
,QLWLDO
'HVFULSWLRQ
Check for fluid leaks.
Hydraulic fluid level (check with platform fully lowered)
6HFXUH)RU2SHUDWLRQ
,QLWLDO
'HVFULSWLRQ
Secure all covers and panels.
(576HULHV6FLVVRU/LIWV2SHUDWRU¶V0DQXDO
Summary of Contents for 3394-ERT
Page 2: ... 57 6HULHV 6FLVVRU LIWV 2SHUDWRU V 0DQXDO 3DJH L 5HYLVLRQ LVWRU DWH 8SGDWH 5HDVRQ ...
Page 14: ...6HFWLRQ 57 6HULHV 6FLVVRU LIWV 2SHUDWRU V 0DQXDO 3DJH 3ODWIRUP RQWUROV RPSRQHQW RFDWLRQV ...
Page 15: ...Section 3DJH RPSRQHQW RFDWLRQV 3ODWIRUP RQWUROV 57 6HULHV 6FLVVRU LIWV 2SHUDWRU V 0DQXDO ...
Page 16: ...Section 3DJH RZHU RQWUROV RPSRQHQW RFDWLRQV 57 6HULHV 6FLVVRU LIWV 2SHUDWRU V 0DQXDO ...
Page 42: ... 57 6HULHV Scissor Lifts Operator s Manual 3DJH 1RWHV ...
Page 43: ... 57 6HULHV 6FLVVRU LIWV 2SHUDWRU V 0DQXDO 3DJH 1RWHV ...