![Glowworm Ultimate 80FF Installation & Servicing Instructions Manual Download Page 12](http://html1.mh-extra.com/html/glowworm/ultimate-80ff/ultimate-80ff_installation-and-servicing-instructions-manual_2234645012.webp)
12
220683B
Diagram 4.1
Diagram 4.2
Diagram 4.3
Standard Flue terminal illustrated.
Standard Flue terminal illustrated.
4 F l u e a n d A p p l i a n c e P r e p a r a t i o n
REAR FLUE LENGTHS
Distance R = Wall thickness
STD.
75mm to 685mm
1M
75mm to 1015mm
2M
75mm to 2015mm
3M
75mm to 2995mm
SIDE FLUE LENGTHS
Distance S = External wall face to boiler case
STD.
81mm to 693mm
1M
81mm to 1023mm
2M
81mm to 2023mm
3M
81mm to 3003mm
4791
4125
4126
CARTON TOP
WALL
TEMPLATE
LOOSE
ITEMS
PACK
MOUNTING
BRACKET
INSTRUCTIONS
BOILER
4.1 Unpacking
Open the carton, check the items supplied against the
boiler pack contents list on the flap, see diagram 4.1.
4.2 Flue Position and Length
Determine flue application, length and terminal position
before starting.
Refer to diagram 4.2 or 4.3.
If you are using a Flue Bend or a Vertical Flue Kit,
please follow the instructions supplied with that kit.
To make a neat finish to the flue outlet a flue collar kit,
part No. 443286, with instructions, is available.
The use of this collar will mean that the flue lengths will
need to be altered, full instructions are given in the kit.