5  Commisioning

5.1 Filling Secondary DHW Circuit

NOTE:

 Do not manually open the temperature and pressure 

relief valve or expansion relief valve for venting purposes 

(any foreign matter in the pipework may cause damage to the 

valve seats).

Ensure that the cylinder drain valve (fig. 6) is closed.

Open all the hot and cold water outlet taps or other fittings.

Open the mains water supply to the Glow-worm cylinder and 

continue filling until water runs freely from the outlet taps/

fittings, ensuring all air pockets are purged.

Close the outlet taps/fittings and check the system for leaks. 

Specially check the connection of the immersion heater for 

leaks.

The system should now be thoroughly flushed.

Open hot water taps at opposite ends of the system and 

allow water to discharge for at least 5 minutes.

Close the hot water taps.

5.2 Filling the Central Heating Circuit.

NOTE:

 Do not use boiler pressure relief valve for venting 

purpose.

The complete CH system must be flushed out with both cold 

and hot water. Fill and vent the central heating system as 

detailed in the boiler installation instructions.

To assist with this operation set the manual override lever 

on the 2 port diverter valve (diagram 4.6) to the MANUAL 

position, and lock in this position by pushing the lever into the 

valve head.

Completely drain the CH system, then refill and vent.

Reset the lever on the 2 port valve to the ”AUTO” position 

by releasing the manual operating lever from the valve head 

(pull outwards).  For commissioning purposes and to reduce 

the time for the cylinder contents to reach temperature, set 

the cylinder hot water thermostat knob to the middle position 

(approx. 40°C).

Operate the boiler as in section 5.3 until the cylinder has 

reached temperature and all radiators in the system are hot. 

Then once again drain the complete CH system to remove 

residues from the pipework and refill and vent again as 

above.

Reset the manual operating lever on the 2 port valve to 

the ”AUTO” position once the system has been refilled and 

vented.

5.3 Operating the Boiler

Ensure the boiler mains switch is turned on.

Ensure that the programmer and room thermostat is 

calling for heat.

Check that the boiler operates and heats the cylinder 

contents and the radiators according to the DHW and 

room thermostat settings.

Carry out the commissioning and testing procedures 

detailed in the installation instructions supplied with the 

boiler.

Upon completion of the commissioning procedures, adjust 

the DHW thermostat on the Glow-worm cylinder to approx. 

60°C, and set the back up immersion heater thermostat to 

60°C, see diagram 4.8.

5.4 Benchmark Log Book

Complete the Benchmark Cylinder Commissioning 

Checklist included in the inside back pages of these 

instructions.

5.5 User’s Instructions

Hand these instructions for use to the user for retention 

and instruct in the safe operation of the boiler and cylinder. 

Advise the user of the operation of the cylinder thermostat 

and the immersion heater thermostat, and that normally 

a setting, which gives a stored water temperature of 

approximately 60°C is adequate.

NOTE:

 In hard water areas the DHW temperature setting 

should not exceed this setting to avoid possible scale 

build-up.

Advise the user of the precautions necessary to prevent 

damage to the system and to the building if the system 

does not remain operative during frost conditions.

Advise the user that the immersion heater is provided as 

a back up means of water heating and is not intended for 

use at the same time that the boiler is heating the cylinder.

Finally, advise the user that for continued efficient and 

safe operation, the boiler and Glow-worm cylinder should 

be serviced at least once a year by a qualified servicing 

company. 

It is the Law that any servicing is carried out by a 

competent person

 approved at the time by the Health 

and Safety Executive. It is important and strongly 

recommended that arrangements are made for a 

maintenance agreement with a qualified servicing 

company to ensure regular servicing of the boiler and 

cylinder.

Please contact Glow-worm's Own Service Organisation 

(01773-828100) for further details.

NOTE:

 Leave installation, servicing and user instructions 

with the user.

6 Maintenance

The following maintenance work has to be carried out 

annually by the 

competent person

 approved at the time by 

the Health and Safety Executive or Glow-worm's Own Service 

Organisation.

Inspection of pressure/temperature relief valve and expansion 

relief valve.

Manually operate each valve by twisting the operating cap, 

and check if water flows unobstructed via the tundish to the 

discharge point. Ensure that both valves re-seat satisfactorily.

Check pressure of expansion vessel.

Turn off mains water supply and open nearest hot water tap to 

depressurise the DHW system.

Check the expansion vessel charge with a pressure gauge 

at the test point. If the pressure is below 3.0 bar, top up 

with suitable air pressure pump.

Servicing procedures for the Glow-worm boiler are 

contained in the boiler installation and servicing 

instructions.

Complete the service section of Benchmark Cylinder 

Commissioning Checklist included in the inside back 

pages of these instructions.

NOTE:

 In the event that parts require replacement, use 

only genuine spare parts supplied by Glow-worm.

15

Summary of Contents for SS 115

Page 1: ...12563 Unvented hot water storage cylinders SS 115 SS 150 SS 175 SS 200 SS 250 SS 300 Instructions for Use Installation and Servicing www glow worm co uk ...

Page 2: ...ives you peace of mind plus valuable protection against breakdown Benchmark places responsibilities on both manufacturers and installers The purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the approp...

Page 3: ...urrent issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation CONTENTS DESCRIPTION SECTION PAGE Testing and Certification 4 Design Description 4 Technical Data 1 5 Instructions for Use 2 6 Note to Installer 3 8 Installation 4 8 Commissioning 5 15 Maintenance 6 15 Fault Finding 7 16 INTRODUCTION INSTALLATION MAINTENANCE 3 ...

Page 4: ...er mains inlet connections for optimum flow rate To achieve optimum performance from the Glow worm cylinder an adequate cold water mains supply pressure and flow rate must be available see section 4 2 Mains Water pressure DHW Temperature Control The Glow worm cylinder is supplied fitted with an adjustable domestic hot water DHW thermostat with thermal cut out and manual reset button which controls...

Page 5: ... 0 C bar Net weight 28 30 33 39 44 49 kg Weight full 145 175 205 245 310 340 kg Height 969 1179 1339 1499 1789 2109 mm Cylinder connections Cold mains inlet 22 mm compression DHW outlet 22 mm compression Balanced pres cold water outlet 22 mm compression DHW secondary return G 3 4 CH flow 22 mm compression on 2 port valve CH return 22 mm compression Electrical connections 3 kW Immersion heater 230 ...

Page 6: ...ter cylinder together with a boiler provides you a modern efficient high performance heating and hot water system Because your Glow worm hot water cylinder is supplied with water directly from the mains you get the benefit of mains pressure hot water at your hot taps without the need for storage tanks in the loft and without a hot water pump The Glow worm cylinder is made from high quality stainle...

Page 7: ...e Health and safety Executive to the prevailing standards installation book and building regulations at the time of installation 4 The benchmark cylinder commissioning checklist must be completed on installation and kept up to date 5 The Glow worm cylinder must be serviced annually 6 The installation must be in an appropriate location and its use is restricted to potable water chloride levels less...

Page 8: ...alve 6 0 bar incorporating a non return valve E Pressure limiting valve 3 5 bar incorporating a line strainer 3 Note to Installer 4 Installation 4 2 Mains Water Pressure The DHW performance of an Glow worm unvented cylinder installation will depend on to the available mains water supply pressure and flow rate To achieve optimum performance from the Glow worm cylinder a suitable cold mains water su...

Page 9: ...pework Increase the diameter of the pipework if the total resistance of the discharge pipework exceeds the figures shown in the table below The installation of the discharge pipework must be in accordance with G3 see diagram 4 1 600mm maximum 28 mm discharge pipe with 4 elbows and 7 m length from tundish to discharge point Resistance for 4 elbows at 1 0 m each 4 0 m Resistance of discharge pipe 7 ...

Page 10: ... take place the method of termination shown in diagram 4 2 is satisfactory Examples of points to consider when deciding whether a location for the high level discharge is suitable are 1 The possibility taking into account wind effect that someone may be in the path of the water being discharged and if so whether the temperature of the discharge water will have been sufficiently reduced to not be d...

Page 11: ...4 Installation FUNCTIONAL DIAGRAM 12553 FUNCTIONAL DIAGRAM 12554 Diagram 4 4 Diagram 4 5 11 ...

Page 12: ...irectly or via a manifold to a tundish The relief valves must be within 600 mm of the tundish see diagram 4 5 The Glow worm cylinder is provided with an external expansion vessel Connect the expansion vessel to the installed water controls by either i Screwing the vessel directly into the control assembly at the purpose provided connection 4 diagram 4 7 or ii Connecting the vessel to the control a...

Page 13: ...hed The Glow worm cylinder and accompanying boiler may be controlled using various programmers and room thermostats details of which are given in section Control Options The Glow worm cylinder has a factory fitted cylinder thermal cut out thermostat and manual reset Diagram 4 8 IMPORTANT Before resetting the thermal cutout or changing the temperature setting of the thermostat switch the electrical...

Page 14: ... board type E N L 4 E E N L 7 10 4 N E L N E 4 9 N L E 4 10 N L 7 6 6 9 N Room Thermostat Boiler Terminal Main Supply 3 Amp Fused L N 3 4 5 6 7 8 9 10 SL 1 2 3 Central Heating 2 Port Motorised Valve Hot Water 2 Port Motorised Valve Cylinder Stat E BL BR GR OR L N Pump E BL BR GR OR L N HW ON CH ON 2 Channel Programmer L N L in L out N BR Brown BL Blue GR Grey OR Orange W White HW Hot Water CH Cent...

Page 15: ...ck up immersion heater thermostat to 60 C see diagram 4 8 5 4 Benchmark Log Book Complete the Benchmark Cylinder Commissioning Checklist included in the inside back pages of these instructions 5 5 User s Instructions Hand these instructions for use to the user for retention and instruct in the safe operation of the boiler and cylinder Advise the user of the operation of the cylinder thermostat and...

Page 16: ...12560 Diagram 7 1 FAULT A 7 Fault Finding 16 ...

Page 17: ...12561 Diagram 7 2 FAULT B 7 Fault Finding 17 ...

Page 18: ...7 Fault Finding 12564 FAULT C Diagram 7 3 18 ...

Page 19: ...7 Fault Finding 12562 FAULT D Diagram 7 4 19 ...

Page 20: ...20 ...

Page 21: ...21 ...

Page 22: ...COMMISSIONING CHECKLIST MAINS PRESSURE HOT WATER STORAGE SYSTEM ...

Page 23: ...D Number Comments Signature SERVICE 7 Date Energy Efficiency Checklist completed Yes No Engineer Name Company Name Telephone Number Engineer ID Number Comments Signature SERVICE 9 Date Energy Efficiency Checklist completed Yes No Engineer Name Company Name Telephone Number Engineer ID Number Comments Signature SERVICE 2 Date Energy Efficiency Checklist completed Yes No Engineer Name Company Name Tele...

Page 24: ...1 www high efficiency info Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions Glow worm Nottingham Road Belper Derbyshire DE56 1JT 0020005469 02 07 10 ...

Reviews: