
Supplied By www.heating spares.co Tel. 0161 620 6677
25
220692C
25
SECTION
6
Installation
s t e p
12
s t e p
13
3044
Note: To reduce the total lifting
weight remove the electrical control
box and combustion chamber
assembly by following the instructions
in Section 6, step 18 and Section 10,
steps 3,5,6,7,8 and 9.
Lift the boiler into position above the
top mounting bracket, allow the boiler
to slide down the wall onto the top and
bottom wall mounting brackets.
Check the engagement by pulling the
boiler forwards at its base, there should
be no forwards movement.
When the boiler is correctly located
secure it with the two screws.
RIGHT HAND
FLUE HOOD
ASSEMBLY
FAN SIDE
OUTLET
EXTENSION
LEFT HAND
FLUE HOOD
ASSEMBLY
THIS END
TO FAN
TOP
MOUNTING
BRACKET
BOTTOM
MOUNTING
BRACKET