
0020154078_00 - 02/13 - Glow-worm
15
MOUNTING AND INSTALLATION
Envirosorb3 8
Envirosorb3 11
Recommended cable size
eBus
2 x 0.75 mm²
2 x 0.75 mm²
Recommended cable size
eBUS + FLOOR H
4 x 0.75 mm²
4 x 0.75 mm²
∙
Pass the cables through the heat pump cable gland (see
section 4.4.3).
∙
Connect the e-BUS cable to the system control box
complying with the polarity ±.
∙
If a manual reset floor heating protection device (55°C)
is installed on the heating circuit outlet, remove the link
from the terminal (2) and then connect the floor heating
protection device to this terminal.
4.4.3
Cable
routing
b
Caution!
Risk of appliance malfunction
If the very low voltage and low voltage cables are
in the same duct, the very low voltage signal will
be disturbed by the low voltage.
•
Run the very low voltage and low voltage
cables in different ducts.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
A
B
C
D
ØA
ØA
eBus
230V
Key
eBUS
e-BUS cable and
fl
oor heating protection device cable
gland
230V
230V supply cable gland
∙
Measure the diameter of the cable (A).
∙
Use a drill of the same diameter as the cable and drill
through the cable gland seal (B).
∙
Pass the cable through the cable gland provided for this
purpose (C)
∙
Set the cable gland with 2
fl
at spanners (D) to get it tight.
Summary of Contents for Envirosorb3 11
Page 1: ...Installation manual Envirosorb3 8 Envirosorb3 11 The energy you need ...
Page 26: ......
Page 27: ......