background image

TERINA INSTALLATION GUIDE

2  

globalfurnituregroup.com

•Page

globalcontract.com

74

GLOBAL

Contract

• Fall 2017

INSTALLATION GUIDELINES

Flip Top Tables

Legs

Safety Glasses

Allenkeys

Phillips Bit

Spacer Block

3 9/16” x 1 7/8” (included)

Drill

Measuring Tape

Wrench

Required Tools

Pre Assembled Components

1. Connect the leg to cross beam.

Legs

Cable Release/Support Beams

Cross Beam

2. Snap on black plastic cover to
  conceal connection.

3. Snap support block into channel
  on top of cross beam.

Pivot Bracket

4. Remove end cap from the end  
  of the support beam.

5. Ensure pivot bracket is installed 3 9/16” from the end of the extrusion. Replace the end cap.

6. Connect the base to the support beam.
  Insure that black nylon washers (A) are installed between the pivot bracket and the assembly.

9/16”

A

B

C

A

Reviews: