TERINA INSTALLATION GUIDE
2
globalfurnituregroup.com
•Page
globalcontract.com
74
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
Flip Top Tables
Legs
Safety Glasses
Allenkeys
Phillips Bit
Spacer Block
3 9/16” x 1 7/8” (included)
Drill
Measuring Tape
Wrench
Required Tools
Pre Assembled Components
1. Connect the leg to cross beam.
Legs
Cable Release/Support Beams
Cross Beam
2. Snap on black plastic cover to
conceal connection.
3. Snap support block into channel
on top of cross beam.
Pivot Bracket
4. Remove end cap from the end
of the support beam.
5. Ensure pivot bracket is installed 3 9/16” from the end of the extrusion. Replace the end cap.
6. Connect the base to the support beam.
Insure that black nylon washers (A) are installed between the pivot bracket and the assembly.
3
9/16”
A
B
C
A