![Global Skyware 122H Manual Download Page 9](http://html.mh-extra.com/html/global-skyware/122h/122h_manual_2233195009.webp)
2.0
ASSEMBLY AND INSTALLATION
‘G’
‘E’
(BOTH SIDES)
‘A’
‘B’
‘Y’
‘C’
(BOTH SIDES)
‘E’
‘F
‘D’
’
(BOTH SIDES)
TORQUE FIGURES AND SEQUENCE
1.
Torque Qty 4 M8 nuts ‘
A’
to 11ftlb (15Nm)
2.
Torque Qty 4 M10 screws ‘
B
’ to 6ftlb (8Nm)
3.
Torque Qty 1 M8 socket head screw ‘
C
’ to 11ftlb (14.9Nm)
4.
Torque Qty 2 M8 screws ‘
D
’ to 12ftlb (16Nm)
5.
Torque Qty 8 M8 screws ‘
E
’ to 12ftlb (16Nm)
6.*
Lift the feed support (see arrow ‘
Y
’) using
sufficient force
to relieve the load
from the side support struts and torque Qty 4 M8 screws ‘
F
’ to 12ftlb (16Nm)
*
7.
Torque Qty 2 M6 nuts and Qty 2 M6 Screws ‘
G
’ to 4ftlb (5.5Nm)
*
FAILURE TO CARRY OUT STEP 6 AS DESCRIBED WILL RESULT
IN DEGRADED ANTENNA PERFORMANCE*
7