Step 1: Determine the location for installation (Make sure all ADA requirements are
met).
***NOTE: The installation of Global Lift Corp’s anchor system’s are a guideline of
minimum requirements. In some states or municipalities they may require additional
steps due to their local codes or ordinances.***
Step 2: Make sure that all the parts are present (Refer to the parts list)
1 - Anchor Plate with Bonding Lug & bolt
3 - 5/8” x 1” Stainless Steel Bolts
3 - 6” Anchors
Step 3: At the determined location for installation, chalk out a 3’ X 3’ area prior to
cutting out the concrete. (Refer to overview, the front of the Anchor Plate must be
11” to 16” from the water’s edge and 6” deep). New Construction, the concrete
must be 6” deep with a ½” reinforcing rod, minimum of an 18” grid.
NOTE: Make sure all local codes and ordinances are met.
Step 4: Once the 3’ X 3’ area is cut out, make sure you drill in the inner wall of all 4
sides of the area (refer to the section detail) for the purpose of cold pinning the new
concrete to the old concrete. Use 1/2” rebar, 6” to 8” in length.
Step 5: Attach the 3 – 6” threaded anchor’s with the 5/8” x 1” bolts (included) to the
Anchor Plate and tighten down.