I N S T A L L A T I O N A N D M A I N T E N A N C E M A N U A L
T s u n a m i
F A M I L Y
F A S T E T H E R N E T W I R E L E S S B R I D G E S
J U N E 1 9 9 9
PAGE 3-4
SECTION 3: INSTALLATION & ADJUSTMENTS
3.3.2
Line-of-Sight and Path Clearance Guidelines
The
Tsunami
radios will not operate properly unless they have line-of-sight between their
corresponding antennas. The
Tsunami
radio transmission will not pass through trees or other
obstacles. Factors to consider include:
- Earth curvature
- Future growth of trees
- Height of buildings
In addition to the line-of-sight requirement, a well-engineered path will also have additional path
clearance to allow for signal loss due to partial obstructions, atmospheric ducting and ground
reflections. To maximize radio reception, 0.6 times the first Fresnel zone should be calculated and
this distance added to the path clearance (in addition to trees or buildings).
Summary of Contents for Tsunami series
Page 1: ...INSTALLATION AND MAINTENANCE MANUAL WIRELESS FAST ETHERNETBRIDGES 5 3 AND 5 8 GHz UNII LE LAN...
Page 2: ......
Page 14: ......
Page 34: ......