background image

Page 28

TERMS AND CONDITIONS

Gledhill

 (Building Products) 

Ltd

  

AMD.DECEMBER 2013

 

 

CONDITIONS OF SALE & GUARANTEE TERMS

1.

 

Gledhill (Building Products) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear below 

and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us to the 
exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and Warranty 
Terms override those which are contained on the Invoice Forms and all Sales are now subject to these Conditions of 
Sale and Warranty terms only.

2. PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3. SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with 
our printed literature or the literature of any of our component suppliers (subject to any modifications made since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4. PAYMENT

The buyer shall make payment in full within thirty days from the end of the month in which the invoice is dated.  If 
we receive payment in full on or before the due date we will allow an appropriate settlement discount except where 
we have quoted a special net price.  If payment is not received in full on or before the due date we shall be entitled 
in addition to the invoice price to:
(i) 

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods sold 
between the date of receipt of order and the date of receipt of payment in full; and 

(ii) 

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5. TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6. DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk 
and expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had 
been despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7. 

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8. 

RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.

9. 

COMPANY LIABILITY AND GUARANTEE

9.1.  Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2.  Each Guarantee is strictly conditional upon the following:-
9.2.1.  Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2.  The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3.  All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4.  The unit has only been used for the storage of potable water supplied from the public mains. The water quality 

shall be in accordance with European Council Directive 98/83 EC, or revised version at the date of installation, 
and is not fed with water from a private supply. Particular:

 

Chloride content: 

Max. 200 mg/l

 

Sulphate content: 

Max. 200 mg/l

 

Combination chloride/sulphate: 

Max. 300 mg/l (in total)

9.2.5  Where appropriate the unit has been regularly maintained as detailed in the installation and service instructions 
9.2.6.  Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7.  Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.2.8. We will not accept any labour charges associated with replacing the unit or parts for any of the following 

products listed.

9.2.9.  If the newly fitted water heater is not in regular use then it must be flushed through with fresh water for at least 

15 minutes. Open at least one hot water tap once per week, during a period of at least 4 weeks.

9.3.  Guarantees are provided in respect of specified goods supplied by Gledhills as follows:- 

(a)  Domestic and Commercial Open Vented Cylinders and Tanks.

 

The storage vessel is guaranteed for ten years and if it proves to be defective either in materials or workmanship, 
we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete 
product to any address in Great Britain.

  (i)    free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b)  Domestic Mains Fed Products [Primary Stores]

 

The storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage vessel 
assembly proves to be defective either in materials or workmanship, we reserve the right to either repair or 
supply replacements or the closest possible substitute in the case of any obsolete product and will collect and 
deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).

  (i)  free of all charge during the first year after delivery 

by us.

 (ii) thereafter at a charge of one-fifth of the then current 

list price or any copper price supplement and 
delivery charge during the second year after delivery 
by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

 

(c)  StainlessLite Unvented Cylinders

 

Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED TEMPERATURE AND PRESSURE RELIEF VALVE 
MUST NOT BE REMOVED OR ALTERED IN ANY WAY OR 
THE GUARANTEE WILL NOT BE VALID.  GLEDHILL WILL 
NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL LOSS 
OR DAMAGE HOWEVER IT IS CAUSED. 

 

The guarantee for the stainless steel vessel is 
for twenty five years against material defect or 
manufacturing faults if the original unit is returned to 
us AND PROVIDED THAT:   

  (i)  It has not been modified, other than by Gledhill.
  (ii)  It has not been subjected to wrong or improper 

use or left uncared for.

  (iii) It has only been used for the storage of potable 

water supplied from the public mains, max 
200mg/litre chloride.

  (iv)  It has not been subjected to frost damage.
  (v)  The benchmark service record is completed after 

each annual service.

  (vi)  The unit has been serviced annually.
  (vii) Any disinfection has been carried out strictly in 

accordance with BS6700.

 

If the stainless steel vessel proves to be defective 
either in materials or workmanship we reserve the 
right to either repair or supply replacements or the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):

  (i)  free of charge during the first year after delivery by 

us.

  (ii)  thereafter at a charge of one twenty fifth of the 

then current list price during the second year 
after delivery by us and increasing by a further 
one twenty fifth on the second and subsequent 
anniversary of delivery by us.

 

ACTION IN THE EVENT OF FAILURE  

 

We will require the return of a cylinder which develops 
a leak for inspection. If our examination confirms a 
failure then an appropriate level of credit against the 
cost of the original cylinder will be issued in line with 
the terms of our warranty.

Please note:

  -    Installation must have been carried out by a 

licensed specialized company (heating contractor 
or plumber) following the version of installation 
instructions in force.

  - 

  Gledhill or its representative was given the 

opportunity to check complaints on site 
immediately after any defect occurred.

 - 

 Confirmation exists that the system was 

commissioned properly and  that the system 
was checked and maintenance was performed 
annually by a specialised company licensed for 
this purpose.

(d) Components of our products other than 
Storage Vessels and Integral Pipework.  

 

We will either extend to the purchaser the same terms 
of warranty as we are given by the manufacturer of the 
component or if the manufacturer does not give any 
warranty, replace free of charge any component which 
becomes defective within two years after the date of the 
delivery by us and is returned to us at the purchaser’s 
expense but we shall not meet the cost of removal or 
shipping or return of the component or any other cost 
charges or damages incurred by the purchaser.

9.4. 
9.4.1. In respect of goods supplied by us  and in respect of 

any installation work carried out by or on our behalf, 
our entire liability and the purchaser’s sole remedies 
(subject to the Guarantees) shall be as follows:-

  (a)  We accept liability for death or personal injury to 

the extent that it results from our negligence or 
that of our employees

Summary of Contents for BoilerMate CP 120

Page 1: ...tion Servicing Instructions Models covered in this manual BoilerMate CP 120 BoilerMate CP 150 BoilerMate CP 180 BoilerMate CP 220 BoilerMate CP Mains pressure hot water thermal store for use with central plant boilers ...

Page 2: ...edhill product and we hope you get satisfactory service from Gledhill If not please let us know Benchmarkplacesresponsibilitiesonbothmanufacturersandinstallers Thepurposeisto ensure that customers are provided with the correct equipment for their needs that it is installed commissionedandservicedinaccordancewiththemanufacturersinstructions by competent persons and that it meets the requirements of...

Page 3: ...s completed by a person registered with a competent person scheme the commissioning notice willbesuppliedbythatperson otherwisethepersoncarryingouttheworkmustnotify therelevantbuildingcontrolbody thatcommissioninghastakenplaceinaccordance with the Domestic Heating Compliance Guide The building control body will then be able to issue a completion certificate This applies to England for other jurisd...

Page 4: ...ibitorshould be specified at the time of order for hardness levels between 200 and 300 ppm mg l Wherethewaterisveryhardie300ppm mg l andabovethe optionalpolyphosphate type inhibitor should be specified at the time of order However this will need to be fitted by the installer at a suitable point in the cold water supply to the appliance The printed circuit board incorporates the facility to automat...

Page 5: ...22 0 22 0 28 Standing heat loss kWh 24hr 1 19 1 35 1 44 1 71 Model Selection Guide BoilerMate CP Dwelling Type Bedroom 1 2 2 3 2 3 2 4 Bathroom 1 or 1 1 2 En suite shower rooms 1 1 2 1 Model required BMCP120 BMCP150 BMCP180 BMCP220 Notes 1 Plastic top up cistern will be supplied separately 2 Theflowratesarebasedona35 Ctemperatureriseandassumethatrecommended pressures and adequate flow are availabl...

Page 6: ...0 Top up cistern complete with cold feed open vent pipework assembly is supplied separately 11 Store sensor 12 Cylinder thermostat 13 Boiler return Note The immersion heater is a low watt density type with incaloy 825 sheaths and are specially manufactured to suit thermal stores It is recommended that any replacements should be obtained from Gledhill Spares The immersion heater is fitted with cont...

Page 7: ...ent to the appliance the width depth will need increasing to accommodate this Appliance Dimensions Model Height A Width B Depth C BMCP120 1075 530 595 BMCP150 1145 560 630 BMCP180 1275 560 630 BMCP220 1575 560 630 Minimum Cupboard Dimensions Model Height D Width E Depth F BMCP120 1825 570 610 BMCP150 1895 600 645 BMCP180 2025 600 645 BMCP220 2325 600 645 B E C BoilerMate CP Top up cistern Top up c...

Page 8: ... connector have been specified If a warning overflow pipe is NOT provided the F E Cistern should be filled from a temporary hose connection incorporating a double check valve This can be from a temporary hose connection supplied from a cold water tap or a permanent cold branch provided adjacent to theTop up Cistern The temporary connection must be removed once the appliance is filled Note All dime...

Page 9: ...smustbecapableofprovidingforthoseservices which could be required to be supplied simultaneously and this maximum demand should be calculated using procedures defined in BS EN 806 1 5 BS EN 8558 2011 If a water meter is fitted in the service pipe it should have a nominal rating to match the maximum hot and cold water peak demands calculated in accordance with BS EN 806 1 5 BS EN 8558 2011 Please no...

Page 10: ...nufacturer confirms that the design criteria of the new system is at least equivalent to the use of BS EN Standard copper pipework and fittings Taps Shower Fittings Aerated taps are recommended to prevent splashing Any type of shower mixing valve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamicchangesparticularlywhenother...

Page 11: ...e above diagram shows the BoilerMate CP installed to a system where the pumped supplyisadequatetoovercomethepressurelossoftheBoilerMateCPheatexchanger coil the pressure loss over the central heating system components and all other components fitted to it In addition all the components fitted are able to withstand the pressure in the district system In the above diagram the cold water supply to the...

Page 12: ... Temp filling loop required Heat meter Diverter Valve not mid position CH flow to dwelling CH return from dwelling Pump and plate heat exchanger position to overcome pressure loss additional expansion requirement and excess district pressure requirements District supply District return Coil flow and return Plate heat exchanger Local expansion system connection required CH Bypass Zone valve Open ve...

Page 13: ...rk and or tap washers and or washing machine valves Cupboardtemperatureswillnormallybeslightlyhigherthaninaconventionalsystem and the design of the cupboard and door will need to take this into account No ventilation is normally required to the cupboard The separate Top up cistern will need to be located on top of the appliance or at high level in the cupboard housing the BoilerMate CP The dimensi...

Page 14: ... the H S E The appliance can be moved using a sack truck on the rear face although care should be taken and the route should be even In apartment buildings containing a number of storeys we would recommend that the appliancesaremovedverticallyinamechanical lift If it is proposed to use a crane expert advice should be obtained regarding the need for slings lifting beams etc Beforeinstallationthesit...

Page 15: ...coming mains cold water D 22mm Domestic hot water E Drain tap connection F 28mm Boiler flow G 28mm Boiler return Note The safety open vent and cold feed expansion must be connected to the top up cistern using the pipework assembly provided Do not alter or connect any pressure relief device to the vent pipe of this water heater All factory made joints should be checked after installation in case th...

Page 16: ... Arrangements Must Not Be Used No valves should be fitted in the safety open vent which must be a minimum of 22mm copper pipe or equivalent throughout its length The mains cold water supply to the ballvalve if provided shall be provided with a suitable servicing valve The overflow warning pipe if provided shall have a continuous fall be fitted to dischargeclearofthebuildingandbesitedsothatanyoverf...

Page 17: ...xternal wiring from the adjacent isolator through the service slot provided in the base of the appliance Clamp the cables in the grips provided and ensure all cables are routed to avoid hot surfaces Note The appliance pipework should be bonded to earth to comply with the IEE Requirements for Electrical Installations BS 7671 Before switching on the electrical supply check all the factory made termi...

Page 18: ...N E PL SL Wiring diagram no pump required Programmer Fuse Spur L N E L N On On Off Off HW CH Store thermostat E C 1 2 2 port zone valve ML MN E PL SL Room thermostat E C 1 2 3 port divert valve ML MN E PL SL Wiring diagram CH pump required CH Pump L N E The following control wiring diagrams ensure that the district heating system is isolated from the dwelling when charging is not required ...

Page 19: ...STALLATION Programmer Fuse Spur L N E L N On On Off Off HW CH Store thermostat E C 1 2 2 port zone valve ML MN E PL SL Room thermostat E C 1 2 3 port divert valve ML MN E PL SL Wiring diagram HW CH pump required CH Pump L N E ...

Page 20: ...ng from a ballvalve failure If an overflow is not provided ensure the temporary filling hose is isolated and removed from its connection to the cold water supply It is essential that all systems function properly for optimum performance Toachievethistheflowratefromeachtapshouldbecheckedandasuitablenumberof taps run simultaneously to check the impact of this on the flow rate at individual taps We r...

Page 21: ...n facility can operate to prevent the pump sticking 9 DO ensure that the functioning and control of the system is explained to the occupant 10 DON T place any clothing or other combustible materials against or on top of this appliance The front panel should then be refitted Annual Servicing No annual servicing of the BoilerMate CP is necessary However if required the operation of the controls and ...

Page 22: ...ate heat exchanger 24 Plate GT017 3 Pump isolating valve outlet 90 valve GT135 4 Pump isolating valve inlet GT133 5 Immersion heater 3kW SH003 6 Stat XB081 7 Main PCB controller XB103 8 Sensors GT198 9 Y strainer XB314 1 9 8 2 3 4 5 6 7 SERVICING SHORT PARTS LIST ...

Page 23: ...rn and vent the pump if necessary Water hammer loose pipework and or tap washers and or washing machine valves Causes of Unsatisfactory Hot Water Service See table opposite Overflow from Feed and Expansion Cistern Check that the controlled level of water in the cistern is at the correct level Adjust if required and check the ballvalve is shutting off the water supply S6 On P Heater Off P Heater S4...

Page 24: ...ay is controlled by 2 buttons S1 and S2 The flow chart of display modes is shown above Generally each press of button S2 cycles the display from top to bottom and each press of button S1 cycles the display functions from left to right The button S2 is also used to reset the appliance i e clear the lockout errors and reset the appliance Note Appliance resetting can also be carried out using the pus...

Page 25: ...d House 40 New Road Stourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps Mi...

Page 26: ...Page 26 APPENDIX APPENDIX B ...

Page 27: ...ifting at the top of the product Each appliance is supplied with a pallet which has been attached to the unit via the packaging The pallet will also allow for one or two persons to get a good hold e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware ...

Page 28: ...on chloride sulphate Max 300 mg l in total 9 2 5 Whereappropriatetheunithasbeenregularlymaintainedasdetailedintheinstallationandserviceinstructions 9 2 6 Defects caused by corrosion or scale deposits are not covered by any Guarantee 9 2 7 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises 9 2 8 We will not accept any labour charges associated with r...

Page 29: ... i the Purchaser shall hold the goods in a fiduciary capacity for us and shall store the same separately from any other goods in the Purchaser s possession and in a manner which enables them to be identified as our goods ii the Purchaser shall immediately return the goods to us should our authorised representative so request All the necessary incidents associated with a fiduciary relationship shal...

Page 30: ...Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet C All appropriate pipes have been insulated up to 1 metre or the point where they become concealed Yes UNVENTED SYSTEMS ONLY KHUH LV WKH SUHVVXUH UHGXFLQJ YDOYH VLWXDWHG LI WWHG What is the pressure reducing valve setting bar DV D FRPELQHG WHPSHUDWXUH DQG SUHVVXUH UHOLHI YDOYH D...

Page 31: ...ame Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Comments...

Page 32: ...o provide further customer support with a range of services including Low cost annual repair and maintenance contracts direct from Gledhill Annual servicing and safety checks Expert response to out of warranty breakdowns at fixed charges Please call 08445 679898 or visit www gledhill net for further details Only the best is acceptable FM 02057 Gledhill Building Products Limited Sycamore Estate Squ...

Reviews: