
79032998 A Rev.
01-29
General Information
FIG. 53: Left-hand side of combine next to the battery
tray.
Rotor gear box fitting (1) (50 hours or weekly).
Center Pivot (2) (50 hours or weekly).
FIG. 54: Left-hand side of combine next grain tank.
Cross auger shaft (1) (100 hours).
NOTE: If cross auger shear bolt fails, lubricate the cross
auger shaft after replacement of the shear bolt.
FIG. 53
1
2
N722120
FIG. 54
1
N323280