Ergo In Demand, Inc.
•
Support line 800-888-6024
•
www.ergoindemand.com
Tools Needed for Assembly
• Stud finder ("edge to edge" stud finder is recommended)
• Phillips screwdriver
• Drill with 1/4" and 5/32" drill bits.
• Bubble level.
Parts List
Item
Description
Quantity
A
Self-Dr illing Dr ywall Anchor s Diameter : 9 / 1 6 Over all Length: 2 -
1 / 2 Hole Size: 9 / 1 6 Scr ew Size: # 8 M ater ial: Zinc - Gr ade
3 (includes scr ews)
5
B
Flat W asher s M at er ial: Nylon -
4
C
Flat W asher s - Stainless Steel Type
4
C
Stainless steel standoff
4
D
Plastic cushion wahers
8
A B C
D
Dry wall Installation (Wood Stud Wall)
Installation of your Glass Whiteboard is simple and straightforward but it requires careful
handling of at least two people. By following these steps your board will be properly
installed, secured and ready for immediate use.
Notes. Please don’t undress Glassboard from its plastic wrap until you are ready to hang it
. This prevents scratches from happening when friction occurs against walls.