background image

concrete

100

(min. distance from any 

edge of the concrete)

Position the Bollard (Item 1) centrally on the intended site and 
orientate it correctly with regard to the site requirements (i.e. 
Retroreflective Sign Faces and Fluorescent Yellow Panels).

Using the Bollard, mark out the 4 x hole positions, ensuring they are 
a minimum of 100mm from the edge of the concrete foundation.

Drill the 4 x Ø16mm holes no less than 80mm deep ensuring they 
match the hole centres of the Bollard base.

Insert an Anchor Rawl Plug (Item 2) into each of the 4 x drilled holes, 
then using a hammer (if required), tap flush with the ground level. 

Bollard Installation:

Place Washer (Item 3) on top of the Anchor and align the centres.

Spray a suitable Lubricant/Grease (e.g. WD40) generously into the
threads of the 4 x Anchors (to aid assembly and future removal).

Orientate the Bollard correctly aligning all 4 x holes to the Anchors.

Insert Spacer (Item 4) into each of the 4 x fixing holes in the Bollard 
base.

Orientate correctly and place Cover-Cap Washer Plate (Item 6), 
followed by Washer (Item 5) onto each of the 4 x Screws (Item 7), 
then secure the Bollard to the Anchors using a 6mm Allen Key. 

To complete, snap-fit a Cover-Cap (Item 8) over each of the 4 x 
Screws.

Signmaster Ultra

INSTALLATION AND MAINTENANCE INSTRUCTIONS

KIT CONTENTS:

ITEM 1 - Bollard 

 

 

 

 

x 1 

ITEM 2 - Anchor Rawl Plug   

 

 

x 4

ITEM 3 - Washer - M10 x 30mm 

 

 

x 4

ITEM 4 - Spacer - M10 x 28mm 

 

 

x 4

ITEM 5 - Washer - M10 x 50mm 

 

 

x 4

ITEM 6 - Cover Cap Washer Plate  

 

 

x 4

ITEM 7 - Screw - M10 x 100mm 

 

 

x 4

ITEM 8 - Cover Cap - Black or White   

 

x 4

TOOLS/EQUIPMENT REQUIRED:

- 6mm Allen Key (Supplied within kit)
- Ø16mm Masonry Drill Bit
- Appropriate Power Drill
- Hammer
- Appropriate Lubricant / Grease Spray

Please also refer to the ‘Manual Handling Operations Regulations 1992’ during the handling of the 

product and materials used for installation. Glasdon recommends that a full Health and Safety 

analysis and site survey is carried out prior to installation.

IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE

1 of 4

1

DIAGRAM NOT TO SCALE

2

3

4

5

6

7

8

BOLT DOWN FIXING INSTRUCTIONS

ALL DIMENSIONS IN MM

Summary of Contents for Signmaster Ultra

Page 1: ...Bollard base Orientate correctly and place Cover Cap Washer Plate Item 6 followed by Washer Item 5 onto each of the 4 x Screws Item 7 then secure the Bollard to the Anchors using a 6mm Allen Key To complete snap fit a Cover Cap Item 8 over each of the 4 x Screws Signmaster Ultra INSTALLATION AND MAINTENANCE INSTRUCTIONS KIT CONTENTS ITEM 1 Bollard x 1 ITEM 2 Anchor Rawl Plug x 4 ITEM 3 Washer M10 ...

Page 2: ...er the diagram If the depth of hole is restricted to less than 400mm the Adj Depth Fixings Item 2A can be altered by moving the bottom washer up then cutting the bars to the desired length with a Hacksaw We would recommend using the same amount of concrete by increasing the width of the hole accordingly Place gravel and support blocks in the base of the prepared hole to act as a levelling foundati...

Page 3: ...of as replacement fixings are provided in the kit Remove the Bollard Body from the Base Use a dry soft bristled brush to clean the Base including the fixing recesses to ensure they are free of dirt and grime before fitting the new Body To fit the new Bollard Body to the Base Place the Body Item 1 into the existing Base Fit the replacement Bollard Body and Base with 2 x new Spacers Item 2 into the ...

Page 4: ...REMOVAL Use a 6mm Allen Key one is supplied with the Bollard to untighten the ground fixing Screws Remove the Bollard and fixings Retain the fixings if replacement fixings are not required Install the new Bollard referring to the Bollard Installation instructions on Page 1 of this booklet If installing a spare Base as a replacement first fit the Bollard Body to the Base as shown in the steps on Pa...

Reviews: