background image

ELECTRA

®

 BIN

Operator Instruction Leaflet

12.

Place the bin in the desired location. 

Inspect the condition of the concrete you 

wish to install in to. If installing into paving 

slabs- ensure fixings are not positioned 

within 110mm of the edge of a slab (as 

doing so may cause the slab to break).

13.

Move the bin to one side to 

allow the holes to be drilled. 

Ensure the holes are clearly 

visible.

Mark the positions of the 

four ground fixing holes in 

the base of the bin onto the 

concrete base below using 

a marker pen.

11.

KIT CONTENTS:

ITEM 1 - Anchor Rawl Plug 

x 4

ITEM 2 - Screw (M10 x 60mm) x 4

ITEM 3 - M10 x 50mm Washer  x 4

14.

Using a powerful drill - drill the four 

16mm diameter fixing holes to a 

minimum depth of 80mm. Afterwards, 

take care to ensure the concrete dust 

is removed from the holes using an air 

blower or sweeping brush.

15.

Take the four Anchor Rawl 

Plugs (ITEM 1) and using a 

hammer gently tap them 

into the four ground fixing 

holes.

16.

Place the bin back into 

position. Take care to align 

the ground fixing holes.

3

17.

Take the M10 Screws (ITEM 2) and 

Washers (ITEM 3) and fit them 

through the base of the bin and 

into the ground anchor sleeves fit-

ted into the concrete.

18.

Tighten the M10 Screws using a 

Socket Wrench fitted with a17mm 

Socket or 17mm Spanner - 

(maximum recommended torque 

setting is 40Nm).

TOOLS REQUIRED:

Marker Pen

Drill with 

Ø

16mm Masonry Drill Bit

Hammer

17mm Socket Set or 17mm Spanner

Lubricant or Grease

To Install the Litter Bin 

(Ground Fixing).

Reviews: