
Operation
START UP DELAYED AIR PURGE
.
Prime system per system manual instructions.
.
Set air regulator to 120 psi, this is recommended
operation pressure, 90 psi is minimum recommend-
ed set point.
.
Push slide valve to the “ON” position on the gun, air
purge should be on.
.
Trigger Gun and hold
a.
The “Red eye” on the control box face should pull
“off”
.
Release gun trigger
a.
Air purge should not be present & “red eye” “off”
for 2 seconds
6.
Air purge will resume and “red eye” be “on”
NOTE
The air purge requires at least 1 second of trigger “on” to
fully engage the delay spool & deactivate the air purge.
START UP PNEUMATIC COUNTER
.
Prime system per manual instructions
.
Set air regulator to 100 psi, this is recommended
operation pressure, 90 psi is minimum recommended
set point.
.
Depress and hold set button (to left of counter face)
depress each corresponding push button to set cycle
count
a.
I.E. 00015 = 15 pump cycles
.
It is recommended to test spray system before
activating the timer box. During initial start up leave
Timer box “on/off” switch to the “off” position.
.
After determining set point of counter, switch unit “on”
and begin operation
NOTE
The Timer requires at least 1 second of trigger “on” to fully
engage the delay spool & activate the unit.