
Pneumatic Unit Installation
.
Counter input: Connect #21203-00 from barb fitting
on the bottom of control the box to the drive cylinder
switches. See signal switch paragraph.
.
locate upper signal tubing (clear) and cut line 1 ½”
from signal valve.
.
Locate lower signal tubing (blue) and cut line 1 ½”
from signal valve.
.
Install counter stroke signal tee sub-assembly, in line of
each signal valve line
1
4
4
2
3