background image

K

IT

: P/N 938-02000-01 

K

IT 

I

NSTRUCTIONS

: P/N 063-09019-01

 

 

R

EVISION

D

ATE

8/28/08  

P

AGE

2

 

2008

©

 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 

Step 1:  Cut Out the NACA Scoop in the Fuselage 

Side 

 

 
Figure 6 on the last page of these instructions is a full-size template 
of the NACA scoop for the cabin air vents.  Glue this template to a 
piece of stiff cardboard and cut it out. 
 
Figure 1 shows how the template should be positioned on the 
outside of the fuselage shell.  The narrow forward edge of the 
template should be positioned 

3 ½” aft

 of the cowling attach flange 

joggle, and the centerline of the template should be 

parallel to

 and 

8” below

 the waterline of the aircraft. 

CAUTION:

  The NACA scoop cutout location given above is taken 

from one of our GlaStar / Sportsman demonstrators

.  

However, early 

customer experience suggests that, due to variations in the position of 
the cage relative to the shells, the specified cutout location may lead to 
interference between cage tubes and the 

cabin air vent boxes

.  

Therefore, treat this location as provisional until you have verified 
clearance, as described below. 

 
Tape the template in position on the exterior of the fuselage shell.  
Then position the appropriate air box on the inside of the shell 
opposite the template so that the NACA scoop-shaped portion of 
the box is aligned with the template (see Figure 3).  The box should 
clear all cage tubes when pressed against the fuselage shell. 
 
Check both sides and adjust the position of the cutout as necessary 

before 

cutting into the shell.  It is acceptable to move the location 

as much as several inches from that specified above; however, 
take reasonable care to keep the centerline of the cutout parallel 
with the aircraft waterline.  When you are satisfied that both boxes 
will clear, trace around the perimeter of the template with a marking 
pen.  Then cut all the way through the fuselage shell, removing the 
material inside the marked line.  Cut slightly inside he line initially 
and then finish up the cutout with a file and sandpaper. 
 

CAUTION:

  Take care not to damage the cage structure behind the 

fuselage shell as you make the NACA scoop cutout. 

 

Completed:  Left [   ]  Right [   ] 

Summary of Contents for GLASTAR

Page 1: ...s fresh air into the cabin through two small but very effective NACA style scoops on the fuselage sides Airflow can be controlled by the pilot and passenger using two adjustable eyeball ventilators Th...

Page 2: ...tubes and the cabin air vent boxes Therefore treat this location as provisional until you have verified clearance as described below Tape the template in position on the exterior of the fuselage shell...

Page 3: ...938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 3 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 1 POSITIONING THE AIR BOX FOR INSTALL...

Page 4: ...the aircraft to receive the air drawn into the system through the NACA scoops The air box in turn provides mounting surface for the eyeball ventilators Prepare the air box for installation by first tr...

Page 5: ...all ventilator in the square aft face of the box Find the center of the face by marking diagonal lines from the corners and then use a 2 hole saw to cut a circle centered on that point Finally fit the...

Page 6: ...08 Copyright Glasair Aviation LLC Arlington Washington All rights reserved Position 10 nutplate jig 45 to corner Countersink 40 holes for AN426AD3 3 rivets Using standard procedures install a K1000 3...

Page 7: ...TIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 7 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved Cleco K1000 3 nutplates in position Completed Left Right Use hand riv...

Page 8: ...layout of the air box relative to the cage Align the pre molded NACA scoop section of the air box with the cutout you made in Step 1 Verify that the air box clears the cage structure and relieve the...

Page 9: ...batch of thick resin milled fiber mixture and spread it evenly over the air box mounting plate Position the box against the fuselage side and use four clecos to pin it in place Then using the NACA sco...

Page 10: ...l the way around the cutout At the aft edge of the cutout increase the depth of this trough to about Once you have removed the foam core as described above fill the resulting troughs back in with Bond...

Page 11: ...T P N 938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 11 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 4 FINISHING THE NACA SCOOP EDGE...

Page 12: ...hown in Figure 5 use NAS603 8P round head machine screws to install the eyeball ventilator in the air box Note If you intend to upholster over your air boxes you will want to do so before installing t...

Page 13: ...N 938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 13 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 6 NACA SCOOP TEMPLATE FULL SIZE 6 0...

Reviews: